X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404150112002

Well Details

Well ID: 0404150112002
Loading map...
Location: 00/12-01-040-15W4/2
Location Alias: 00/12-01-40-15 W4M
Location Alias 2: 00/12-01-040-15 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 15
Section: 01
County/Municipality: County of Paintearth No. 18
Well Name: CPEC GALAHAD 12-1-40-15
Operator Name: Crescent Point Energy Corp.
License Number: 0153808
License Date: 1992-09-22
License Status: Abandoned
Spud Date: 1992-10-22
Final Drill Date: 1992-10-25
Well Total Depth: 1155.00 m
Surface Hole Latitude: 52.413151
Surface Hole Longitude: -112.040759

For data sources see[1][2]

Well History

Date Event
1992-09-22 Obtained License
1992-10-23 Surface Casing Operation Performed
1992-10-25 Finished Drilling
1992-10-25 Well Log Performed
1992-10-25 Well Mode changed to Drilled and Cased
1992-10-26 Drill Stem Test Performed
1992-10-27 Production Casing Operation Performed
1992-10-27 Rig Released
1992-11-20 Well Log Performed
1992-11-21 Well Log Performed
1992-11-22 Perforation Treatment Performed - Jet Perforation
1992-11-22 Well Log Performed
1992-11-23 Well Log Performed
1992-11-24 Perforation Treatment Performed - Jet Perforation
1992-12-15 Well Began Production
1992-12-15 Well Fluid changed to Crude Oil
1992-12-15 Well Mode changed to Pumping
1994-12-31 Well Fluid changed to Crude Oil
1994-12-31 Well Mode changed to Suspended
2004-05-01 Well Fluid changed to Crude Oil
2004-05-01 Well Mode changed to Pumping
2013-11-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-26 Plug Back Performed
2013-11-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-11-28 Plug Back Performed
2013-11-28 Well Fluid changed to Crude Oil
2013-11-28 Well Log Performed
2013-11-28 Well Mode changed to Abandoned Zone
2013-12-02 Perforation Treatment Performed - Jet Perforation
2013-12-02 Well Log Performed
2013-12-05 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2013-12-05 Perforation Treatment Performed - Bridge Plug No Cement Required
2013-12-05 Plug Back Performed
2013-12-14 Well Abandoned
2013-12-14 Well Fluid changed to Crude Oil
2013-12-14 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-11-22 Perforation 1101.20 1103.20 18
1992-11-24 Perforation 1089.00 1090.60 18
2013-11-26 Packing Device Capped w/Cement 1090.80 1098.80 0
2013-11-28 Packing Device Capped w/Cement 1076.00 1084.80 0
2013-12-02 Perforation 375.00 376.00 17
2013-12-05 Bridge Plug, No Cement 375.00 376.00 0
2013-12-05 Packing Device Capped w/Cement 359.60 367.60 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 249 0.0 0.0 0.0
1993 87 0.0 0.0 0.0
2004 4683 0.0 0.0 0.0
2005 7152 0.0 0.0 0.0
2006 8121 0.0 0.0 0.0
2007 5583 0.0 0.0 0.0
2008 7321 0.0 0.0 0.0
2009 8561 0.0 0.0 0.0
2010 7269 0.0 0.0 0.0
2011 3350 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2013-11-25 No Incident Encountered 0.00 0.00

For data sources see[6]

References