X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404142514000

Well Details

Well ID: 0404142514000
Loading map...
Location: 00/14-25-040-14W4/0
Location Alias: 00/14-25-40-14 W4M
Location Alias 2: 00/14-25-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 25
County/Municipality: Flagstaff County
Well Name: KARVE PROVOST 14-25-40-14
Operator Name: Karve Energy Inc.
License Number: 0423005
License Date: 2010-08-26
License Status: Abandoned
Spud Date: 2010-10-07
Final Drill Date: 2010-10-12
Well Total Depth: 2185.00 m
Surface Hole Latitude: 52.474051
Surface Hole Longitude: -111.872508

For data sources see[1][2]

Well History

Date Event
2010-08-26 Obtained License
2010-10-01 Well Log Performed
2010-10-07 Surface Casing Operation Performed
2010-10-07 Well Log Performed
2010-10-08 Direction Drilling Operation Performed - Horizontal
2010-10-08 Well Log Performed
2010-10-09 Intermediate Casing Operation Performed
2010-10-11 Well Log Performed
2010-10-12 Finished Drilling
2010-10-12 Well Mode changed to Drilled and Cased
2010-10-13 Well Log Performed
2010-10-14 Liner Casing Operation Performed
2010-10-14 Perforation Treatment Performed - Open-Hole Completion
2010-10-15 Rig Released
2010-10-18 Well Log Performed
2010-10-24 Perforation Treatment Performed - Multi-Stage Fracture
2010-10-24 Well Began Production
2010-10-24 Well Fluid changed to Crude Oil
2010-10-24 Well Mode changed to Flowing
2015-10-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-10-15 Plug Back Performed
2015-10-15 Well Fluid changed to Crude Oil
2015-10-15 Well Mode changed to Abandoned Zone
2015-10-16 Well Abandoned
2015-10-16 Well Fluid changed to Crude Oil
2015-10-16 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2010-10-08 542.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2010-10-14 Open Hole/Barefoot Completion 1063.00 2185.00 0
2010-10-24 Multi-Stage Fracture 1500.00 1500.10 0
2010-10-24 Multi-Stage Fracture 1275.00 1275.10 0
2010-10-24 Multi-Stage Fracture 1203.00 1203.10 0
2010-10-24 Multi-Stage Fracture 1117.00 1117.10 0
2015-10-15 Packing Device Capped w/Cement 886.50 936.50 0
2010-10-24 Multi-Stage Fracture 2080.00 2080.10 0
2010-10-24 Multi-Stage Fracture 2020.00 2020.10 0
2010-10-24 Multi-Stage Fracture 1920.00 1920.10 0
2010-10-24 Multi-Stage Fracture 1848.00 1848.10 0
2010-10-24 Multi-Stage Fracture 1776.00 1776.10 0
2010-10-24 Multi-Stage Fracture 1703.00 1703.10 0
2010-10-24 Multi-Stage Fracture 1644.00 1644.10 0
2010-10-24 Multi-Stage Fracture 1558.00 1558.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2010 882 0.0 0.0 0.0
2011 1862 0.0 0.0 0.0
2012 136 0.0 0.0 0.0
2013 5782 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2010-10-24 No Incident Encountered 0.00 0.00
2015-10-15 No Incident Encountered 0.00 0.00

For data sources see[7]

References