X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404142008000

Well Details

Well ID: 0404142008000
Loading map...
Location: 00/08-20-040-14W4/0
Location Alias: 00/08-20-40-14 W4M
Location Alias 2: 00/08-20-040-14 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 14
Section: 20
County/Municipality: Flagstaff County
Well Name: KARVE PROVOST 8-20-40-14
Operator Name: Karve Energy Inc.
License Number: 0427642
License Date: 2010-12-13
License Status: Amended
Spud Date: 2011-01-20
Final Drill Date: 2011-01-26
Well Total Depth: 2256.00 m
Surface Hole Latitude: 52.465665
Surface Hole Longitude: -111.977381

For data sources see[1][2]

Well History

Date Event
2010-12-13 Obtained License
2011-01-21 Surface Casing Operation Performed
2011-01-21 Well Log Performed
2011-01-22 Direction Drilling Operation Performed - Horizontal
2011-01-23 Intermediate Casing Operation Performed
2011-01-23 Well Log Performed
2011-01-24 Well Log Performed
2011-01-26 Finished Drilling
2011-01-26 Well Log Performed
2011-01-26 Well Mode changed to Drilled and Cased
2011-01-28 Liner Casing Operation Performed
2011-01-28 Perforation Treatment Performed - Open-Hole Completion
2011-01-28 Rig Released
2011-01-30 Well Log Performed
2011-02-13 Perforation Treatment Performed - Multi-Stage Fracture
2011-02-14 Well Began Production
2011-02-14 Well Fluid changed to Crude Oil
2011-02-14 Well Mode changed to Flowing
2015-05-31 Perforation Treatment Performed - Chemical Squeeze
2015-06-01 Perforation Treatment Performed - Acid Squeeze - Press Used

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2011-01-22 543.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2011-01-28 Open Hole/Barefoot Completion 2225.00 2256.00 0
2011-02-13 Multi-Stage Fracture 1740.00 1740.10 0
2011-02-13 Multi-Stage Fracture 1802.00 1802.10 0
2011-02-13 Multi-Stage Fracture 1853.00 1853.10 0
2011-02-13 Multi-Stage Fracture 1927.00 1927.10 0
2011-02-13 Multi-Stage Fracture 2001.00 2001.10 0
2015-05-31 Chemical Squeeze 1853.00 1853.10 0
2015-05-31 Chemical Squeeze 1802.00 1802.10 0
2015-05-31 Chemical Squeeze 1740.00 1740.10 0
2015-05-31 Chemical Squeeze 1654.00 1654.10 0
2015-06-01 Acid Treatment 1366.00 1366.10 0
2011-02-13 Multi-Stage Fracture 1252.00 1252.10 0
2015-06-01 Acid Treatment 1303.00 1303.10 0
2015-06-01 Acid Treatment 1252.00 1252.10 0
2011-02-13 Multi-Stage Fracture 1303.00 1303.10 0
2011-02-13 Multi-Stage Fracture 1366.00 1366.10 0
2011-02-13 Multi-Stage Fracture 1428.00 1428.10 0
2011-02-13 Multi-Stage Fracture 1490.00 1490.10 0
2011-02-13 Multi-Stage Fracture 1553.00 1553.10 0
2011-02-13 Multi-Stage Fracture 1592.00 1592.10 0
2011-02-13 Multi-Stage Fracture 1654.00 1654.10 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 5836 0.0 0.0 0.0
2012 8548 0.0 0.0 0.0
2013 7676 0.0 0.0 0.0
2014 8576 0.0 0.0 0.0
2015 8274 0.0 0.0 0.0
2016 8502 0.0 0.0 0.0
2017 8511 0.0 0.0 0.0
2018 8722 0.0 0.0 0.0
2019 8543 0.0 0.0 0.0
2020 2160 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-06-11 No Incident Encountered 0.00 0.00

For data sources see[7]

References