If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404131106030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.424939,"lon":-111.768773,"icon":""}]} |
Location: 03/06-11-040-13W4/0 | |
Location Alias: 03/06-11-40-13 W4M | |
Location Alias 2: 03/06-11-040-13 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 13 | |
Section: 11 | |
County/Municipality: Flagstaff County | |
Well Name: PRED 03 HALKIRKE 6-11-40-13 | |
Operator Name: Pismo Energy Ltd. | |
License Number: 0146455 | |
License Date: 1990-11-22 | |
License Status: Issued | |
Spud Date: 1990-11-22 | |
Final Drill Date: 1990-11-26 | |
Well Total Depth: 1045.00 m | |
Surface Hole Latitude: 52.424939 | |
Surface Hole Longitude: -111.768773 |
Date | Event |
---|---|
1990-11-22 | Obtained License |
1990-11-23 | Surface Casing Operation Performed |
1990-11-26 | Finished Drilling |
1990-11-26 | Well Mode changed to Drilled and Cased |
1990-11-27 | Drill Stem Test Performed |
1990-11-27 | Well Log Performed |
1990-11-29 | Production Casing Operation Performed |
1990-11-29 | Rig Released |
1990-12-04 | Well Log Performed |
1990-12-05 | Perforation Treatment Performed - Jet Perforation |
1990-12-15 | Well Began Production |
1990-12-15 | Well Fluid changed to Crude Oil |
1990-12-15 | Well Mode changed to Pumping |
1996-08-28 | Well Fluid changed to Crude Oil |
1996-08-28 | Well Mode changed to Suspended |
1996-08-29 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1996-08-29 | Perforation Treatment Performed - Jet Perforation |
1996-08-29 | Plug Back Performed |
1996-08-29 | Well Log Performed |
1997-06-25 | Well Fluid changed to Crude Oil |
1997-06-25 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1990-12-05 | Perforation | 1001.70 | 1003.00 | 13 |
1996-08-29 | Packing Device Capped w/Cement | 989.00 | 992.00 | 0 |
1996-08-29 | Perforation | 983.00 | 984.00 | 17 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
1990 | 312 | 0.0 | 0.0 | 0.0 |
1991 | 8467 | 0.0 | 0.0 | 0.0 |
1992 | 8454 | 0.0 | 0.0 | 0.0 |
1993 | 2493 | 0.0 | 0.0 | 0.0 |
For data sources see[5]