X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404122915A02

Well Details

Well ID: 0404122915A02
Loading map...
Location: A0/15-29-040-12W4/2
Location Alias: A0/15-29-40-12 W4M
Location Alias 2: A0/15-29-040-12 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 29
County/Municipality: Flagstaff County
Well Name: CPEC PROVOST 15-29-40-12
Operator Name: Crescent Point Energy Corp.
License Number: 0152517
License Date: 1992-05-19
License Status: Suspension
Spud Date: 1992-06-13
Final Drill Date: 1992-06-16
Well Total Depth: 1060.00 m
Surface Hole Latitude: 52.477286
Surface Hole Longitude: -111.692999

For data sources see[1][2]

Well History

Date Event
1992-05-19 Obtained License
1992-06-13 Surface Casing Operation Performed
1992-06-14 Direction Drilling Operation Performed - Deviate
1992-06-16 Finished Drilling
1992-06-16 Production Casing Operation Performed
1992-06-16 Well Log Performed
1992-06-16 Well Mode changed to Drilled and Cased
1992-06-17 Rig Released
1992-06-21 Well Log Performed
1992-06-22 Perforation Treatment Performed - Jet Perforation
2003-07-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-17 Perforation Treatment Performed - Jet Perforation
2003-07-17 Plug Back Performed
2003-07-17 Well Log Performed
2003-07-23 Perforation Treatment Performed - Fractured
2008-08-07 Well Began Production
2008-08-07 Well Fluid changed to Crude Oil
2008-08-07 Well Mode changed to Pumping
2011-09-01 Well Fluid changed to Crude Oil
2011-09-01 Well Mode changed to Suspended
2013-06-01 Well Fluid changed to Crude Oil
2013-06-01 Well Mode changed to Pumping
2013-08-01 Well Fluid changed to Crude Oil
2013-08-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-06-14 230.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-22 Perforation 993.50 994.80 13
2003-07-17 Packing Device Capped w/Cement 981.00 989.00 0
2003-07-17 Perforation 823.50 825.00 13
2003-07-17 Perforation 827.00 828.00 13
2003-07-17 Perforation 832.50 834.50 13
2003-07-23 Fracture 823.50 825.00 0
2003-07-23 Fracture 827.00 828.00 0
2003-07-23 Fracture 832.50 834.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 3483 0.0 0.0 0.0
2009 8575 0.0 0.0 0.0
2010 2873 0.0 0.0 0.0
2013 2 0.0 0.0 0.0

For data sources see[6]

References