X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404122605C00

Well Details

Well ID: 0404122605C00
Loading map...
Location: C0/05-26-040-12W4/0
Location Alias: C0/05-26-40-12 W4M
Location Alias 2: C0/05-26-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 26
County/Municipality: Flagstaff County
Well Name: TALLGRASS 5C PROVOST 5-26-40-12
Operator Name: Tallgrass Energy Corp.
License Number: 0135671
License Date: 1988-08-19
License Status: Abandoned
Spud Date: 1988-08-21
Final Drill Date: 1988-08-25
Well Total Depth: 1073.00 m
Surface Hole Latitude: 52.466284
Surface Hole Longitude: -111.637725

For data sources see[1][2]

Well History

Date Event
1988-08-19 Obtained License
1988-08-21 Direction Drilling Operation Performed - Deviate
1988-08-21 Surface Casing Operation Performed
1988-08-25 Finished Drilling
1988-08-25 Well Log Performed
1988-08-25 Well Mode changed to Drilled and Cased
1988-08-26 Production Casing Operation Performed
1988-08-26 Rig Released
1988-08-26 Well Log Performed
1988-09-09 Well Log Performed
1988-09-10 Perforation Treatment Performed - Jet Perforation
1988-10-01 Well Began Production
1988-10-01 Well Fluid changed to Crude Oil
1988-10-01 Well Mode changed to Pumping
2011-09-30 Well Fluid changed to Crude Oil
2011-09-30 Well Mode changed to Suspended
2016-02-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-02-28 Plug Back Performed
2016-02-28 Well Fluid changed to Crude Oil
2016-02-28 Well Mode changed to Abandoned Zone
2016-03-06 Well Abandoned
2016-03-06 Well Fluid changed to Crude Oil
2016-03-06 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1988-08-21 22.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-09-10 Perforation 1043.50 1044.50 13
2016-02-28 Packing Device Capped w/Cement 1016.40 1027.40 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 1407 0.0 0.0 0.0
1989 7837 0.0 0.0 0.0
1990 8134 0.0 0.0 0.0
1991 8042 0.0 0.0 0.0
1992 8420 0.0 0.0 0.0
1993 8256 0.0 0.0 0.0
1994 8698 0.0 0.0 0.0
1995 8532 0.0 0.0 0.0
1996 8173 0.0 0.0 0.0
1997 8489 0.0 0.0 0.0
1998 8676 0.0 0.0 0.0
1999 8609 0.0 0.0 0.0
2000 8685 0.0 0.0 0.0
2001 8153 0.0 0.0 0.0
2002 6927 0.0 0.0 0.0
2003 8585 0.0 0.0 0.0
2004 3592 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-02-29 No Incident Encountered 0.00 0.00

For data sources see[7]

References