X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404121910000

Well Details

Well ID: 0404121910000
Loading map...
Location: 00/10-19-040-12W4/0
Location Alias: 00/10-19-40-12 W4M
Location Alias 2: 00/10-19-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 19
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 10-19-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0205615
License Date: 1997-09-02
License Status: Abandoned
Spud Date: 1997-09-07
Final Drill Date: 1997-09-10
Well Total Depth: 1026.00 m
Surface Hole Latitude: 52.455700
Surface Hole Longitude: -111.715602

For data sources see[1][2]

Well History

Date Event
1997-09-02 Obtained License
1997-09-08 Direction Drilling Operation Performed - Deviate
1997-09-08 Surface Casing Operation Performed
1997-09-10 Finished Drilling
1997-09-10 Well Log Performed
1997-09-10 Well Mode changed to Drilled and Cased
1997-09-11 Production Casing Operation Performed
1997-09-11 Rig Released
1997-09-13 Perforation Treatment Performed - Jet Perforation
1997-09-13 Well Log Performed
1997-09-22 Well Began Production
1997-09-22 Well Fluid changed to Crude Oil
1997-09-22 Well Mode changed to Pumping
2001-10-18 Perforation Treatment Performed - Jet Perforation
2001-10-18 Well Log Performed
2003-02-28 Well Log Performed
2010-11-25 Well Fluid changed to Crude Oil
2010-11-25 Well Mode changed to Suspended
2016-03-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2016-03-02 Plug Back Performed
2016-03-02 Well Fluid changed to Crude Oil
2016-03-02 Well Mode changed to Abandoned Zone
2016-04-04 Well Abandoned
2016-04-04 Well Fluid changed to Crude Oil
2016-04-04 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1997-09-08 325.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-09-13 Perforation 1000.50 1002.00 13
2001-10-18 Perforation 1004.00 1005.00 20
2016-03-02 Packing Device Capped w/Cement 986.00 995.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1997 2441 0.0 0.0 0.0
1998 8728 0.0 0.0 0.0
1999 8704 0.0 0.0 0.0
2000 8754 0.0 0.0 0.0
2001 8525 0.0 0.0 0.0
2002 8645 0.0 0.0 0.0
2003 7756 0.0 0.0 0.0
2004 8737 0.0 0.0 0.0
2005 6486 0.0 0.0 0.0
2006 3705 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2016-03-02 No Incident Encountered 0.00 0.00

For data sources see[7]

References