X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404121703000

Well Details

Well ID: 0404121703000
Loading map...
Location: 00/03-17-040-12W4/0
Location Alias: 00/03-17-40-12 W4M
Location Alias 2: 00/03-17-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 17
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 3-17-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0148887
License Date: 1991-05-16
License Status: Suspension
Spud Date: 1991-05-22
Final Drill Date: 1991-05-25
Well Total Depth: 1025.00 m
Surface Hole Latitude: 52.434516
Surface Hole Longitude: -111.698860

For data sources see[1][2]

Well History

Date Event
1991-05-16 Obtained License
1991-05-22 Surface Casing Operation Performed
1991-05-23 Direction Drilling Operation Performed - Deviate
1991-05-25 Finished Drilling
1991-05-25 Well Log Performed
1991-05-25 Well Mode changed to Drilled and Cased
1991-05-26 Production Casing Operation Performed
1991-05-26 Rig Released
1991-05-27 Well Log Performed
1991-05-28 Perforation Treatment Performed - Jet Perforation
1991-05-28 Well Log Performed
1991-05-31 Well Began Production
1991-05-31 Well Fluid changed to Crude Oil
1991-05-31 Well Mode changed to Pumping
1995-04-30 Perforation Treatment Performed - Jet Perforation
1995-04-30 Well Log Performed
1998-10-31 Well Fluid changed to Crude Oil
1998-10-31 Well Mode changed to Suspended
2001-09-11 Well Fluid changed to Crude Oil
2001-09-11 Well Mode changed to Pumping
2002-08-13 Well Fluid changed to Crude Oil
2002-08-13 Well Mode changed to Suspended
2005-11-23 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2005-11-23 Plug Back Performed
2005-11-23 Well Fluid changed to Crude Oil
2005-11-23 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-05-23 379.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-05-28 Perforation 1002.00 1005.00 13
1995-04-30 Perforation 1006.50 1007.50 13
2005-11-23 Packing Device Capped w/Cement 983.50 991.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 4567 0.0 0.0 0.0
1992 8472 0.0 0.0 0.0
1993 7692 0.0 0.0 0.0
1994 3962 0.0 0.0 0.0
1995 3779 0.0 0.0 0.0
2001 2364 0.0 0.0 0.0
2002 3013 0.0 0.0 0.0

For data sources see[6]

References