X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404120913C00

Well Details

Well ID: 0404120913C00
Loading map...
Location: C0/13-09-040-12W4/0
Location Alias: C0/13-09-40-12 W4M
Location Alias 2: C0/13-09-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 09
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 13-9-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0149521
License Date: 1991-07-24
License Status: Issued
Spud Date: 1991-08-04
Final Drill Date: 1991-08-09
Well Total Depth: 1143.00 m
Surface Hole Latitude: 52.433442
Surface Hole Longitude: -111.681201

For data sources see[1][2]

Well History

Date Event
1991-07-24 Obtained License
1991-08-04 Surface Casing Operation Performed
1991-08-08 Well Log Performed
1991-08-09 Finished Drilling
1991-08-09 Well Mode changed to Drilled and Cased
1991-08-10 Production Casing Operation Performed
1991-08-10 Rig Released
1991-08-10 Well Log Performed
1991-08-20 Perforation Treatment Performed - Jet Perforation
1991-08-20 Well Log Performed
1991-08-21 Perforation Treatment Performed - Acid Squeeze - Press Used
1991-08-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1991-08-22 Plug Back Performed
1991-08-22 Well Log Performed
1991-08-23 Perforation Treatment Performed - Jet Perforation
1991-08-27 Well Began Production
1991-08-27 Well Fluid changed to Crude Oil
1991-08-27 Well Mode changed to Pumping
2008-02-08 Well Log Performed
2008-05-02 Perforation Treatment Performed - Cement Squeeze
2008-05-06 Perforation Treatment Performed - Jet Perforation
2008-05-06 Well Log Performed
2008-05-09 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-05-10 Well Log Performed
2010-11-25 Well Fluid changed to Crude Oil
2010-11-25 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-08-20 Perforation 1040.00 1044.50 13
1991-08-21 Acid Treatment 1040.00 1044.50 0
1991-08-22 Packing Device Capped w/Cement 1022.00 1030.00 0
1991-08-23 Perforation 987.00 989.00 13
2008-05-02 Cement Squeeze 987.00 989.00 0
2008-05-06 Perforation 1006.00 1012.00 17
2008-05-06 Perforation 1001.00 1006.00 17
2008-05-09 Acid Treatment 1001.00 1012.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 2985 0.0 0.0 0.0
1992 8450 0.0 0.0 0.0
1993 8655 0.0 0.0 0.0
1994 8079 0.0 0.0 0.0
1995 8519 0.0 0.0 0.0
1996 7786 0.0 0.0 0.0
1997 8420 0.0 0.0 0.0
1998 7555 0.0 0.0 0.0
1999 8703 0.0 0.0 0.0
2000 8762 0.0 0.0 0.0
2001 8657 0.0 0.0 0.0
2002 8687 0.0 0.0 0.0
2003 8289 0.0 0.0 0.0
2004 7613 0.0 0.0 0.0
2005 8692 0.0 0.0 0.0
2006 3860 0.0 0.0 0.0

For data sources see[5]

References