X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404120805000

Well Details

Well ID: 0404120805000
Loading map...
Location: 00/05-08-040-12W4/0
Location Alias: 00/05-08-40-12 W4M
Location Alias 2: 00/05-08-040-12 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 12
Section: 08
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 5-8-40-12
Operator Name: AlphaBow Energy Ltd.
License Number: 0159794
License Date: 1993-07-19
License Status: Suspension
Spud Date: 1993-08-04
Final Drill Date: 1993-08-07
Well Total Depth: 1073.00 m
Surface Hole Latitude: 52.426594
Surface Hole Longitude: -111.704831

For data sources see[1][2]

Well History

Date Event
1993-07-19 Obtained License
1993-08-04 Surface Casing Operation Performed
1993-08-05 Direction Drilling Operation Performed - Deviate
1993-08-07 Finished Drilling
1993-08-07 Well Log Performed
1993-08-07 Well Mode changed to Drilled and Cased
1993-08-08 Production Casing Operation Performed
1993-08-08 Rig Released
1993-08-18 Perforation Treatment Performed - Jet Perforation
1993-08-19 Well Log Performed
1993-09-06 Well Began Production
1993-09-06 Well Fluid changed to Crude Oil
1993-09-06 Well Mode changed to Pumping
1993-09-14 Well Log Performed
1993-10-19 Perforation Treatment Performed - Jet Perforation
1993-10-19 Well Log Performed
1998-10-30 Well Fluid changed to Crude Oil
1998-10-30 Well Mode changed to Suspended
2008-04-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-04-01 Perforation Treatment Performed - Jet Perforation
2008-04-01 Plug Back Performed
2008-04-01 Well Fluid changed to Crude Oil
2008-04-01 Well Log Performed
2008-04-01 Well Mode changed to Abandoned Zone
2008-04-15 Perforation Treatment Performed - Fractured
2008-05-26 Perforation Treatment Performed - Jet Perforation
2008-05-26 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-08-05 187.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-08-18 Perforation 1040.00 1043.00 13
1993-10-19 Perforation 1044.00 1045.00 13
2008-04-01 Packing Device Capped w/Cement 1022.00 1030.00 0
2008-04-01 Perforation 859.00 863.00 17
2008-04-15 Fracture 859.00 863.00 0
2008-05-26 Perforation 857.00 861.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2687 0.0 0.0 0.0
1994 8325 0.0 0.0 0.0
1995 8291 0.0 0.0 0.0
1996 8172 0.0 0.0 0.0
1997 8706 0.0 0.0 0.0
1998 5181 0.0 0.0 0.0

For data sources see[6]

References