X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404113603000

Well Details

Well ID: 0404113603000
Loading map...
Location: 00/03-36-040-11W4/0
Location Alias: 00/03-36-40-11 W4M
Location Alias 2: 00/03-36-040-11 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 11
Section: 36
County/Municipality: Flagstaff County
Well Name: COYOTE PROVO 3-36-40-11
Operator Name: Harvest Operations Corp.
License Number: 0152422
License Date: 1992-05-07
License Status: Suspension
Spud Date: 1992-05-19
Final Drill Date: 1992-05-24
Well Total Depth: 1189.00 m
Surface Hole Latitude: 52.484631
Surface Hole Longitude: -111.454449

For data sources see[1][2]

Well History

Date Event
1992-05-07 Obtained License
1992-05-19 Well Log Performed
1992-05-20 Surface Casing Operation Performed
1992-05-21 Direction Drilling Operation Performed - Deviate
1992-05-24 Finished Drilling
1992-05-24 Well Mode changed to Drilled and Cased
1992-05-25 Production Casing Operation Performed
1992-05-25 Rig Released
1992-05-25 Well Log Performed
1992-05-26 Well Log Performed
1992-06-20 Well Log Performed
1992-08-21 Perforation Treatment Performed - Jet Perforation
1992-10-01 Well Began Production
1992-10-01 Well Fluid changed to Crude Oil
1992-10-01 Well Mode changed to Pumping
1994-12-12 Perforation Treatment Performed - Cement Squeeze
1994-12-15 Perforation Treatment Performed - Jet Perforation
2001-07-02 Perforation Treatment Performed - Jet Perforation
2001-07-03 Well Log Performed
2001-07-04 Perforation Treatment Performed - Jet Perforation
2001-07-04 Well Log Performed
2001-07-07 Well Log Performed
2001-10-05 Well Began Injection
2001-10-05 Well Fluid changed to Water
2001-10-05 Well Type changed to Injection
2006-09-01 Well Fluid changed to Water
2006-09-01 Well Mode changed to Suspended
2006-09-01 Well Type changed to Injection
2010-03-29 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-03-29 Plug Back Performed
2010-03-29 Well Fluid changed to Water
2010-03-29 Well Mode changed to Abandoned Zone
2010-03-29 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1992-05-21 225.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-08-21 Perforation 1077.00 1081.00 13
1994-12-12 Cement Squeeze 1077.00 1081.00 0
1994-12-15 Perforation 1069.60 1075.10 17
2001-07-02 Perforation 1077.00 1081.00 13
2001-07-04 Perforation 1095.00 1155.00 13
2010-03-29 Packing Device Capped w/Cement 1053.00 1065.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 2180 0.0 0.0 0.0
1993 6488 0.0 0.0 0.0
1994 5798 0.0 0.0 0.0
1995 7326 0.0 0.0 0.0
1996 8574 0.0 0.0 0.0
1997 8624 0.0 0.0 0.0
1998 8699 0.0 0.0 0.0
1999 8489 0.0 0.0 0.0
2000 8525 0.0 0.0 0.0
2001 4398 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0

For data sources see[6]

References