X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404113207000

Well Details

Well ID: 0404113207000
Loading map...
Location: 00/07-32-040-11W4/0
Location Alias: 00/07-32-40-11 W4M
Location Alias 2: 00/07-32-040-11 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 11
Section: 32
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 7-32-40-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0015109
License Date: 1958-04-28
License Status: Suspension
Spud Date: 1958-04-29
Final Drill Date: 1958-05-02
Well Total Depth: 967.70 m
Surface Hole Latitude: 52.483058
Surface Hole Longitude: -111.549307

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1958-04-28 Obtained License
1958-05-02 Finished Drilling
1958-05-02 Well Mode changed to Drilled and Cased
1958-05-03 Production Casing Operation Performed
1958-05-06 Perforation Treatment Performed - Bullet Perforation
1958-05-14 Well Began Production
1958-05-14 Well Fluid changed to Crude Oil
1958-05-14 Well Mode changed to Pumping
1990-02-12 Well Log Performed
1990-02-15 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-15 Perforation Treatment Performed - Jet Perforation
1990-02-19 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-02-19 Perforation Treatment Performed - Jet Perforation
1990-02-19 Perforation Treatment Performed - Remedial Casing
1990-02-20 Perforation Treatment Performed - Remedial Casing
2012-05-17 Well Fluid changed to Crude Oil
2012-05-17 Well Mode changed to Suspended

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1958-05-06 Bullet Perforation 945.80 946.70 20
1990-02-15 Perforation 600.00 600.50 13
1990-02-15 Acid Treatment 600.00 600.50 0
1990-02-19 Remedial Casing Cementing 600.00 600.50 0
1990-02-19 Perforation 215.00 215.50 13
1990-02-19 Acid Treatment 215.00 215.50 0
1990-02-20 Remedial Casing Cementing 215.00 215.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 4515 0.0 0.0 0.0
1968 6247 0.0 0.0 0.0
1969 6296 0.0 0.0 0.0
1970 3866 0.0 0.0 0.0
1971 4619 0.0 0.0 0.0
1972 6998 0.0 0.0 0.0
1973 8046 0.0 0.0 0.0
1974 7942 0.0 0.0 0.0
1975 7021 0.0 0.0 0.0
1976 7242 0.0 0.0 0.0
1977 7651 0.0 0.0 0.0
1978 8081 0.0 0.0 0.0
1979 8594 0.0 0.0 0.0
1980 8489 0.0 0.0 0.0
1981 8613 0.0 0.0 0.0
1982 8620 0.0 0.0 0.0
1983 8630 0.0 0.0 0.0
1984 8363 0.0 0.0 0.0
1985 8367 0.0 0.0 0.0
1986 8472 0.0 0.0 0.0
1987 8535 0.0 0.0 0.0
1988 7782 0.0 0.0 0.0
1989 8606 0.0 0.0 0.0
1990 7603 0.0 0.0 0.0
1991 2291 0.0 0.0 0.0
1992 8044 0.0 0.0 0.0
1993 8340 0.0 0.0 0.0
1994 8656 0.0 0.0 0.0
1995 8333 0.0 0.0 0.0
1996 8609 0.0 0.0 0.0
1997 8216 0.0 0.0 0.0
1998 8707 0.0 0.0 0.0
1999 8186 0.0 0.0 0.0
2000 8671 0.0 0.0 0.0
2001 8527 0.0 0.0 0.0
2002 8092 0.0 0.0 0.0
2003 2992 0.0 0.0 0.0
2005 106 0.0 0.0 0.0
2006 6183 0.0 0.0 0.0
2007 8461 0.0 0.0 0.0
2008 8567 0.0 0.0 0.0
2009 7356 0.0 0.0 0.0
2010 7243 0.0 0.0 0.0
2011 1 0.0 0.0 0.0

For data sources see[5]

References