X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404113206050

Well Details

Well ID: 0404113206050
Loading map...
Location: 05/06-32-040-11W4/0
Location Alias: 05/06-32-40-11 W4M
Location Alias 2: 05/06-32-040-11 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 11
Section: 32
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 6-32-40-11
Operator Name: AlphaBow Energy Ltd.
License Number: 0245358
License Date: 2000-11-30
License Status: Suspension
Spud Date: 2000-12-02
Final Drill Date: 2000-12-07
Well Total Depth: 1306.00 m
Surface Hole Latitude: 52.481307
Surface Hole Longitude: -111.551345

For data sources see[1][2]

Well History

Date Event
2000-11-30 Obtained License
2000-12-02 Surface Casing Operation Performed
2000-12-04 Direction Drilling Operation Performed - Horizontal
2000-12-07 Finished Drilling
2000-12-08 Perforation Treatment Performed - Open-Hole Completion
2000-12-08 Perforation Treatment Performed - Slotted Liner or Casing
2000-12-08 Production Casing Operation Performed
2000-12-08 Well Log Performed
2000-12-09 Rig Released
2000-12-09 Well Mode changed to Drilled and Cased
2000-12-15 Well Log Performed
2001-01-01 Well Began Injection
2001-01-01 Well Fluid changed to Water
2001-01-01 Well Type changed to Injection
2001-10-03 Perforation Treatment Performed - Acid Squeeze - Press Used
2008-09-11 Well Log Performed
2009-03-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-19 Plug Back Performed
2009-03-19 Well Fluid changed to Water
2009-03-19 Well Mode changed to Abandoned Zone
2009-03-19 Well Type changed to Injection

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2000-12-04 796.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2000-12-08 Slotted Liner 1049.00 1291.00 0
2000-12-08 Open Hole/Barefoot Completion 1291.00 1306.00 0
2001-10-03 Acid Treatment 1049.00 1291.00 0
2009-03-19 Packing Device Capped w/Cement 880.00 1048.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0

For data sources see[6]

References