X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102706000

Well Details

Well ID: 0404102706000
Loading map...
Location: 00/06-27-040-10W4/0
Location Alias: 00/06-27-40-10 W4M
Location Alias 2: 00/06-27-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 27
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 6-27-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0120226
License Date: 1985-12-11
License Status: Issued
Spud Date: 1985-12-19
Final Drill Date: 1985-12-21
Well Total Depth: 900.00 m
Surface Hole Latitude: 52.467499
Surface Hole Longitude: -111.361828

For data sources see[1][2]

Well History

Date Event
1985-12-11 Obtained License
1985-12-19 Surface Casing Operation Performed
1985-12-21 Finished Drilling
1985-12-21 Well Log Performed
1985-12-21 Well Mode changed to Drilled and Cased
1985-12-22 Drill Stem Test Performed
1985-12-23 Production Casing Operation Performed
1985-12-23 Rig Released
1986-01-10 Well Log Performed
1986-01-11 Perforation Treatment Performed - Jet Perforation
1986-01-16 Well Began Production
1986-01-16 Well Fluid changed to Crude Oil
1986-01-16 Well Mode changed to Pumping
1990-05-24 Perforation Treatment Performed - Jet Perforation
1990-05-24 Well Log Performed
1993-06-14 Well Fluid changed to Crude Oil
1993-06-14 Well Mode changed to Suspended
1994-10-01 Well Fluid changed to Crude Oil
1994-10-01 Well Mode changed to Pumping
1996-06-01 Well Fluid changed to Crude Oil
1996-06-01 Well Mode changed to Suspended
2000-05-27 Well Log Performed
2000-05-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-28 Perforation Treatment Performed - Jet Perforation
2000-05-28 Plug Back Performed
2000-05-28 Well Fluid changed to Crude Oil
2000-05-28 Well Mode changed to Abandoned Zone
2000-05-29 Perforation Treatment Performed - Chemical Squeeze
2000-05-31 Perforation Treatment Performed - Chemical Squeeze
2000-06-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-06-01 Plug Back Performed
2000-06-02 Perforation Treatment Performed - Jet Perforation
2000-06-02 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1986-01-11 Perforation 881.00 882.00 13
1990-05-24 Perforation 881.00 884.00 13
2000-05-28 Packing Device Capped w/Cement 865.00 875.00 0
2000-05-28 Perforation 839.00 841.00 17
2000-05-29 Chemical Squeeze 839.00 841.00 0
2000-05-31 Chemical Squeeze 839.00 841.00 0
2000-06-01 Packing Device Capped w/Cement 820.00 830.00 0
2000-06-02 Perforation 734.50 736.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1986 6416 0.0 0.0 0.0
1987 8621 0.0 0.0 0.0
1988 8173 0.0 0.0 0.0
1989 2519 0.0 0.0 0.0
1990 6931 0.0 0.0 0.0
1991 6739 0.0 0.0 0.0
1992 8714 0.0 0.0 0.0
1993 3850 0.0 0.0 0.0
1994 2028 0.0 0.0 0.0
1995 7090 0.0 0.0 0.0
1996 492 0.0 0.0 0.0

For data sources see[5]

References