X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102214000

Well Details

Well ID: 0404102214000
Loading map...
Location: 00/14-22-040-10W4/0
Location Alias: 00/14-22-40-10 W4M
Location Alias 2: 00/14-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 14-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0017561
License Date: 1959-08-12
License Status: Abandoned
Spud Date: 1959-08-17
Final Drill Date: 1959-08-21
Well Total Depth: 874.50 m
Surface Hole Latitude: 52.461152
Surface Hole Longitude: -111.363281

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1959-08-12 Obtained License
1959-08-21 Finished Drilling
1959-08-21 Well Mode changed to Drilled and Cased
1959-08-23 Production Casing Operation Performed
1959-08-25 Drill Stem Test Performed
1959-08-25 Perforation Treatment Performed - Bullet Perforation
1959-09-22 Well Began Production
1959-09-22 Well Fluid changed to Crude Oil
1959-09-22 Well Mode changed to Pumping
1961-12-01 Well Fluid changed to Crude Oil
1961-12-01 Well Mode changed to Suspended
1962-05-16 Well Fluid changed to Crude Oil
1962-05-16 Well Mode changed to Pumping
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Suspended
1998-11-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-11-25 Perforation Treatment Performed - Jet Perforation
1998-11-25 Plug Back Performed
1998-11-27 Perforation Treatment Performed - Remedial Casing
1998-11-30 Well Abandoned
1998-11-30 Well Fluid changed to Crude Oil
1998-11-30 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1959-08-25 Bullet Perforation 870.50 871.70 20
1998-11-25 Packing Device Capped w/Cement 847.00 855.00 0
1998-11-25 Perforation 161.00 162.00 13
1998-11-27 Remedial Casing Cementing 161.00 162.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1961 0 0.0 0.0 0.0
1962 0 0.0 0.0 0.0
1963 0 0.0 0.0 0.0
1964 0 0.0 0.0 0.0
1965 0 0.0 0.0 0.0
1966 0 0.0 0.0 0.0
1967 8034 0.0 0.0 0.0
1968 8164 0.0 0.0 0.0
1969 7469 0.0 0.0 0.0
1970 7932 0.0 0.0 0.0
1971 7166 0.0 0.0 0.0
1972 7694 0.0 0.0 0.0
1973 8141 0.0 0.0 0.0
1974 8624 0.0 0.0 0.0
1975 8370 0.0 0.0 0.0
1976 8464 0.0 0.0 0.0
1977 8737 0.0 0.0 0.0
1978 8682 0.0 0.0 0.0
1979 8457 0.0 0.0 0.0
1980 8076 0.0 0.0 0.0
1981 7985 0.0 0.0 0.0
1982 8602 0.0 0.0 0.0
1983 8688 0.0 0.0 0.0
1984 8337 0.0 0.0 0.0
1985 8344 0.0 0.0 0.0
1986 8559 0.0 0.0 0.0
1987 7975 0.0 0.0 0.0
1988 8706 0.0 0.0 0.0
1989 8687 0.0 0.0 0.0
1990 7999 0.0 0.0 0.0
1991 5303 0.0 0.0 0.0
1992 7284 0.0 0.0 0.0

For data sources see[5]

References