X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404102211D00

Well Details

Well ID: 0404102211D00
Loading map...
Location: D0/11-22-040-10W4/0
Location Alias: D0/11-22-40-10 W4M
Location Alias 2: D0/11-22-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 22
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 11-22-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0179255
License Date: 1995-07-13
License Status: Abandoned
Spud Date: 1995-07-29
Final Drill Date: 1995-07-31
Well Total Depth: 930.00 m
Surface Hole Latitude: 52.458125
Surface Hole Longitude: -111.359882

For data sources see[1][2]

Well History

Date Event
1995-07-13 Obtained License
1995-07-29 Surface Casing Operation Performed
1995-07-30 Direction Drilling Operation Performed - Deviate
1995-07-31 Finished Drilling
1995-07-31 Well Mode changed to Drilled and Cased
1995-08-01 Production Casing Operation Performed
1995-08-01 Rig Released
1995-08-01 Well Log Performed
1995-08-08 Well Log Performed
1995-08-16 Perforation Treatment Performed - Jet Perforation
1995-08-16 Well Log Performed
1995-08-20 Well Began Production
1995-08-20 Well Fluid changed to Crude Oil
1995-08-20 Well Mode changed to Pumping
1995-08-24 Well Log Performed
1998-10-30 Well Log Performed
2000-01-01 Well Fluid changed to Crude Oil
2000-01-01 Well Mode changed to Suspended
2004-10-22 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-13 Perforation Treatment Performed - Jet Perforation
2012-07-14 Perforation Treatment Performed - Cement Squeeze
2012-07-14 Perforation Treatment Performed - Jet Perforation
2012-07-14 Perforation Treatment Performed - Remedial Casing
2012-07-14 Well Log Performed
2012-07-19 Well Log Performed
2012-07-23 Perforation Treatment Performed - Jet Perforation
2012-07-23 Well Log Performed
2012-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-07-25 Perforation Treatment Performed - Remedial Casing
2012-07-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-07-28 Perforation Treatment Performed - Jet Perforation
2012-07-28 Plug Back Performed
2012-07-28 Well Fluid changed to Crude Oil
2012-07-28 Well Log Performed
2012-07-28 Well Mode changed to Abandoned Zone
2012-07-29 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-07-29 Perforation Treatment Performed - Remedial Casing
2012-07-31 Well Log Performed
2012-08-01 Perforation Treatment Performed - Acid Squeeze - Press Used
2012-08-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-01 Perforation Treatment Performed - Jet Perforation
2012-08-01 Plug Back Performed
2012-08-01 Well Log Performed
2012-08-07 Perforation Treatment Performed - Remedial Casing
2012-08-09 Well Log Performed
2012-08-10 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-08-10 Plug Back Performed
2012-09-07 Well Abandoned
2012-09-07 Well Fluid changed to Crude Oil
2012-09-07 Well Mode changed to Abandoned
2012-09-09 Well Log Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-07-30 143.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-08-16 Perforation 891.50 892.50 13
2012-07-14 Cement Squeeze 891.50 892.50 0
2012-07-14 Remedial Casing Cementing 876.00 879.00 0
2012-07-14 Remedial Casing Cementing 866.00 869.00 0
2012-07-14 Remedial Casing Cementing 862.00 865.00 0
2012-07-23 Perforation 737.00 740.00 17
2012-07-23 Perforation 737.00 740.00 20
2012-07-24 Acid Treatment 737.00 740.00 0
2012-07-25 Remedial Casing Cementing 737.00 740.00 0
2012-07-28 Packing Device Capped w/Cement 724.00 732.00 0
2012-07-28 Perforation 362.00 365.00 17
1995-08-16 Perforation 893.50 896.50 13
2012-07-28 Perforation 362.00 365.00 20
2012-07-29 Acid Treatment 362.00 365.00 0
2012-07-29 Remedial Casing Cementing 362.00 365.00 0
2012-08-01 Packing Device Capped w/Cement 349.50 357.50 0
2012-08-01 Perforation 313.00 316.00 17
2012-08-01 Perforation 313.00 316.00 20
2012-08-01 Acid Treatment 313.00 316.00 0
2012-08-07 Remedial Casing Cementing 313.00 316.00 0
2012-08-10 Packing Device Capped w/Cement 301.00 309.00 0
2004-10-22 Packing Device Capped w/Cement 874.20 882.20 0
2012-07-13 Perforation 891.50 892.50 13
2012-07-13 Perforation 893.50 896.50 13
2012-07-14 Perforation 876.00 879.00 17
2012-07-14 Perforation 866.00 869.00 17
2012-07-14 Perforation 862.00 865.00 17
2012-07-14 Cement Squeeze 893.50 896.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 48 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-08-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References