X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404101413D00

Well Details

Well ID: 0404101413D00
Loading map...
Location: D0/13-14-040-10W4/0
Location Alias: D0/13-14-40-10 W4M
Location Alias 2: D0/13-14-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 14
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 13-14-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0148180
License Date: 1991-02-28
License Status: Abandoned
Spud Date: 1991-03-01
Final Drill Date: 1991-03-05
Well Total Depth: 923.00 m
Surface Hole Latitude: 52.447903
Surface Hole Longitude: -111.346148

For data sources see[1][2]

Well History

Date Event
1991-02-28 Obtained License
1991-03-02 Surface Casing Operation Performed
1991-03-03 Direction Drilling Operation Performed - Deviate
1991-03-04 Well Log Performed
1991-03-05 Finished Drilling
1991-03-05 Production Casing Operation Performed
1991-03-05 Rig Released
1991-03-05 Well Mode changed to Drilled and Cased
1991-03-12 Well Log Performed
1991-03-21 Well Log Performed
1991-03-24 Perforation Treatment Performed - Jet Perforation
1991-03-24 Well Log Performed
1991-04-23 Well Began Production
1991-04-23 Well Fluid changed to Crude Oil
1991-04-23 Well Mode changed to Pumping
1993-03-01 Well Fluid changed to Crude Oil
1993-03-01 Well Mode changed to Suspended
1996-08-07 Perforation Treatment Performed - Jet Perforation
1996-08-07 Well Fluid changed to Crude Oil
1996-08-07 Well Mode changed to Pumping
1996-08-20 Well Fluid changed to Crude Oil
1996-08-20 Well Mode changed to Suspended
2001-03-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-03-28 Plug Back Performed
2001-03-28 Well Fluid changed to Crude Oil
2001-03-28 Well Log Performed
2001-03-28 Well Mode changed to Abandoned Zone
2001-03-29 Perforation Treatment Performed - Jet Perforation
2015-12-09 Perforation Treatment Performed - Jet Perforation
2015-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2015-12-17 Perforation Treatment Performed - Cement Plug
2015-12-17 Perforation Treatment Performed - Cement Squeeze
2015-12-17 Plug Back Performed
2015-12-22 Well Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1991-03-03 256.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1991-03-24 Perforation 880.00 882.00 13
1996-08-07 Perforation 877.50 879.00 13
2001-03-28 Packing Device Capped w/Cement 865.00 875.00 0
2001-03-29 Perforation 857.00 857.80 13
2015-12-09 Perforation 877.00 879.00 13
2015-12-17 Cement Squeeze 877.00 882.00 0
2015-12-17 Cement Plug 874.20 882.00 0
2015-12-17 Packing Device Capped w/Cement 860.30 874.00 0
2015-12-17 Packing Device Capped w/Cement 844.00 853.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1991 5320 0.0 0.0 0.0
1992 2835 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2015-12-18 No Incident Encountered 0.00 0.00

For data sources see[7]

References