X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404101413020

Well Details

Well ID: 0404101413020
Loading map...
Location: 02/13-14-040-10W4/0
Location Alias: 02/13-14-40-10 W4M
Location Alias 2: 02/13-14-040-10 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 10
Section: 14
County/Municipality: Flagstaff County
Well Name: 1994450AB PROVOST 13-14-40-10
Operator Name: AlphaBow Energy Ltd.
License Number: 0131688
License Date: 1988-01-26
License Status: Abandoned
Spud Date: 1988-02-02
Final Drill Date: 1988-02-06
Well Total Depth: 945.70 m
Surface Hole Latitude: 52.447901
Surface Hole Longitude: -111.347221

For data sources see[1][2]

Well History

Date Event
1988-01-26 Obtained License
1988-02-04 Surface Casing Operation Performed
1988-02-06 Finished Drilling
1988-02-06 Well Mode changed to Drilled and Cased
1988-02-07 Drill Stem Test Performed
1988-02-07 Well Log Performed
1988-02-08 Production Casing Operation Performed
1988-02-08 Rig Released
1988-02-10 Perforation Treatment Performed - Jet Perforation
1988-02-11 Well Began Production
1988-02-11 Well Fluid changed to Crude Oil
1988-02-11 Well Mode changed to Pumping
1988-09-02 Perforation Treatment Performed - Acid Squeeze - Press Used
1988-09-02 Perforation Treatment Performed - Cement Squeeze
1988-09-05 Perforation Treatment Performed - Jet Perforation
1993-08-15 Well Fluid changed to Crude Oil
1993-08-15 Well Mode changed to Suspended
1998-10-19 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1998-10-19 Plug Back Performed
1998-10-19 Well Log Performed
1998-11-05 Well Abandoned
1998-11-05 Well Fluid changed to Crude Oil
1998-11-05 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1988-02-10 Perforation 865.00 867.00 13
1988-09-02 Acid Treatment 865.00 867.00 0
1988-09-02 Cement Squeeze 865.00 867.00 0
1988-09-05 Perforation 865.00 867.00 13
1998-10-19 Packing Device Capped w/Cement 848.00 856.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1988 4278 0.0 0.0 0.0
1990 1282 0.0 0.0 0.0
1991 7186 0.0 0.0 0.0
1992 8745 0.0 0.0 0.0
1993 5291 0.0 0.0 0.0

For data sources see[5]

References