If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404090210030 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.409789,"lon":-111.182785,"icon":""}]} |
Location: 03/10-02-040-09W4/0 | |
Location Alias: 03/10-02-40-09 W4M | |
Location Alias 2: 03/10-02-040-09 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 09 | |
Section: 02 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: 1994450AB PROVOST 10-2-40-9 | |
Operator Name: Rockeast Energy Corp. | |
License Number: 0394301 | |
License Date: 2008-02-15 | |
License Status: Suspension | |
Spud Date: 2008-03-04 | |
Final Drill Date: 2008-03-10 | |
Well Total Depth: 1737.00 m | |
Surface Hole Latitude: 52.409789 | |
Surface Hole Longitude: -111.182785 |
Date | Event |
---|---|
2008-02-15 | Obtained License |
2008-03-05 | Surface Casing Operation Performed |
2008-03-06 | Direction Drilling Operation Performed - Horizontal |
2008-03-08 | Intermediate Casing Operation Performed |
2008-03-10 | Finished Drilling |
2008-03-10 | Well Mode changed to Drilled and Cased |
2008-03-11 | Perforation Treatment Performed - Open-Hole Completion |
2008-03-11 | Rig Released |
2008-11-05 | Well Began Production |
2008-11-05 | Well Fluid changed to Crude Oil |
2008-11-05 | Well Mode changed to Pumping |
2012-08-01 | Well Log Performed |
2012-08-03 | Liner Casing Operation Performed |
2015-11-19 | Well Fluid changed to Crude Oil |
2015-11-19 | Well Mode changed to Suspended |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2008-03-06 | 712.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2008-03-11 | Open Hole/Barefoot Completion | 1644.60 | 1737.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2008 | 1248 | 0.0 | 0.0 | 0.0 |
2009 | 6997 | 0.0 | 0.0 | 0.0 |
2011 | 6084 | 0.0 | 0.0 | 0.0 |
2012 | 4254 | 0.0 | 0.0 | 0.0 |
2013 | 8521 | 0.0 | 0.0 | 0.0 |
2014 | 3803 | 0.0 | 0.0 | 0.0 |
For data sources see[6]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2012-08-04 | No Incident Encountered | 0.00 | 0.00 |
2012-08-31 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[7]