X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404082611000

Well Details

Well ID: 0404082611000
Loading map...
Location: 00/11-26-040-08W4/0
Location Alias: 00/11-26-40-08 W4M
Location Alias 2: 00/11-26-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: PENN WEST PROVOST 11-26-40-8
Operator Name: Obsidian Energy Ltd.
License Number: 0127457
License Date: 1987-07-20
License Status: RecExempt
Spud Date: 1987-08-30
Final Drill Date: 1987-09-02
Well Total Depth: 965.00 m
Surface Hole Latitude: 52.471507
Surface Hole Longitude: -111.052791

For data sources see[1][2]

Well History

Date Event
1987-07-20 Obtained License
1987-08-31 Surface Casing Operation Performed
1987-09-02 Drill Stem Test Performed
1987-09-02 Finished Drilling
1987-09-02 Well Log Performed
1987-09-02 Well Mode changed to Drilled and Cased
1987-09-03 Drill Stem Test Performed
1987-09-04 Production Casing Operation Performed
1987-09-04 Rig Released
1987-09-08 Perforation Treatment Performed - Jet Perforation
1987-09-10 Well Began Production
1987-09-10 Well Fluid changed to Crude Oil
1987-09-10 Well Mode changed to Flowing
1988-04-20 Perforation Treatment Performed - Cement Squeeze
1988-04-20 Perforation Treatment Performed - Jet Perforation
1988-04-22 Perforation Treatment Performed - Jet Perforation
1988-09-01 Well Fluid changed to Crude Oil
1988-09-01 Well Mode changed to Suspended
1994-03-03 Well Fluid changed to Crude Oil
1994-03-03 Well Mode changed to Pumping
1996-07-12 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1996-07-12 Plug Back Performed
1996-07-16 Well Abandoned
1996-07-16 Well Fluid changed to Crude Oil
1996-07-16 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1987-09-08 Perforation 892.00 892.50 13
1987-09-08 Perforation 896.50 900.00 13
1988-04-20 Perforation 904.00 905.00 13
1988-04-20 Cement Squeeze 892.00 905.00 0
1988-04-22 Perforation 896.00 899.00 13
1996-07-12 Packing Device Capped w/Cement 868.50 876.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2700 0.0 0.0 0.0
1988 4585 0.0 0.0 0.0
1994 6950 0.0 0.0 0.0
1995 4359 0.0 0.0 0.0
1996 205 0.0 0.0 0.0

For data sources see[5]

References