X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404081609A20

Well Details

Well ID: 0404081609A20
Loading map...
Location: A2/09-16-040-08W4/0
Location Alias: A2/09-16-40-08 W4M
Location Alias 2: A2/09-16-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE A3 PROVOST 9-16-40-8
Operator Name: Harvest Operations Corp.
License Number: 0167067
License Date: 1994-05-12
License Status: Abandoned
Spud Date: 1994-06-13
Final Drill Date: 1994-06-16
Well Total Depth: 940.00 m
Surface Hole Latitude: 52.443254
Surface Hole Longitude: -111.086791

For data sources see[1][2]

Well History

Date Event
1994-05-12 Obtained License
1994-06-14 Surface Casing Operation Performed
1994-06-15 Direction Drilling Operation Performed - Deviate
1994-06-16 Finished Drilling
1994-06-16 Well Log Performed
1994-06-16 Well Mode changed to Drilled and Cased
1994-06-17 Production Casing Operation Performed
1994-06-17 Rig Released
1994-07-27 Perforation Treatment Performed - Jet Perforation
1994-07-27 Well Log Performed
1994-08-05 Well Began Production
1994-08-05 Well Fluid changed to Crude Oil
1994-08-05 Well Mode changed to Pumping
2007-11-01 Well Fluid changed to Crude Oil
2007-11-01 Well Mode changed to Suspended
2011-12-17 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-12-17 Plug Back Performed
2011-12-17 Well Fluid changed to Crude Oil
2011-12-17 Well Mode changed to Abandoned Zone
2019-08-17 Well Abandoned
2019-08-17 Well Fluid changed to Crude Oil
2019-08-17 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-06-15 598.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-27 Perforation 904.00 906.50 13
2011-12-17 Packing Device Capped w/Cement 886.00 896.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 3470 0.0 0.0 0.0
1995 8322 0.0 0.0 0.0
1996 8545 0.0 0.0 0.0
1997 8529 0.0 0.0 0.0
1998 8623 0.0 0.0 0.0
1999 8611 0.0 0.0 0.0
2000 7154 0.0 0.0 0.0

For data sources see[6]

References