X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404081608D00

Well Details

Well ID: 0404081608D00
Loading map...
Location: D0/08-16-040-08W4/0
Location Alias: D0/08-16-40-08 W4M
Location Alias 2: D0/08-16-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE D1 PROVOST 8-16-40-8
Operator Name: Harvest Operations Corp.
License Number: 0167071
License Date: 1994-05-12
License Status: Issued
Spud Date: 1994-06-09
Final Drill Date: 1994-06-12
Well Total Depth: 1012.00 m
Surface Hole Latitude: 52.443254
Surface Hole Longitude: -111.086938

For data sources see[1][2]

Well History

Date Event
1994-05-12 Obtained License
1994-06-10 Surface Casing Operation Performed
1994-06-11 Direction Drilling Operation Performed - Deviate
1994-06-12 Finished Drilling
1994-06-12 Well Log Performed
1994-06-12 Well Mode changed to Drilled and Cased
1994-06-13 Production Casing Operation Performed
1994-06-13 Rig Released
1994-06-30 Well Log Performed
1994-07-23 Perforation Treatment Performed - Jet Perforation
1994-07-23 Well Log Performed
1994-08-05 Well Began Production
1994-08-05 Well Fluid changed to Crude Oil
1994-08-05 Well Mode changed to Pumping
1995-01-24 Perforation Treatment Performed - Cement Squeeze
1995-01-24 Plug Back Performed
1995-01-26 Well Log Performed
1995-01-27 Perforation Treatment Performed - Jet Perforation
1995-01-27 Well Log Performed
1995-01-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1995-02-14 Well Began Injection
1995-02-14 Well Fluid changed to Water
1995-02-14 Well Type changed to Disposal
2003-11-23 Perforation Treatment Performed - Jet Perforation
2003-11-24 Perforation Treatment Performed - Acid Squeeze - Press Used
2003-11-25 Perforation Treatment Performed - Bridge Plug No Cement Required

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-06-11 218.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-07-23 Perforation 972.00 973.50 13
2003-11-25 Bridge Plug, No Cement 961.00 963.00 0
1995-01-24 Cement Squeeze 972.00 973.50 0
1995-01-27 Perforation 979.50 982.00 13
1995-01-27 Perforation 983.00 984.50 13
1995-01-27 Perforation 986.00 1000.00 13
1995-01-28 Acid Treatment 979.50 1000.00 0
2003-11-23 Perforation 997.90 1001.90 17
2003-11-23 Perforation 972.00 978.00 17
2003-11-24 Acid Treatment 972.00 1001.90 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 454 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0
2016 0 0.0 0.0 0.0
2017 0 0.0 0.0 0.0
2018 0 0.0 0.0 0.0

For data sources see[6]

References