X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404081606000

Well Details

Well ID: 0404081606000
Loading map...
Location: 00/06-16-040-08W4/0
Location Alias: 00/06-16-40-08 W4M
Location Alias 2: 00/06-16-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 16
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 6-16-40-8
Operator Name: Surge Energy Inc.
License Number: 0170020
License Date: 1994-08-30
License Status: Abandoned
Spud Date: 1994-09-06
Final Drill Date: 1994-09-09
Well Total Depth: 971.00 m
Surface Hole Latitude: 52.437558
Surface Hole Longitude: -111.098105

For data sources see[1][2]

Well History

Date Event
1994-08-30 Obtained License
1994-09-07 Direction Drilling Operation Performed - Deviate
1994-09-07 Surface Casing Operation Performed
1994-09-09 Finished Drilling
1994-09-09 Well Mode changed to Drilled and Cased
1994-09-10 Production Casing Operation Performed
1994-09-10 Rig Released
1994-10-09 Well Log Performed
1994-10-10 Well Log Performed
1994-10-24 Well Log Performed
1994-10-25 Perforation Treatment Performed - Jet Perforation
1994-10-25 Well Log Performed
1994-11-16 Well Log Performed
1994-12-05 Well Began Production
1994-12-05 Well Fluid changed to Crude Oil
1994-12-05 Well Mode changed to Pumping
1996-10-18 Well Fluid changed to Crude Oil
1996-10-18 Well Mode changed to Suspended
2009-03-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2009-03-07 Plug Back Performed
2009-03-07 Well Fluid changed to Crude Oil
2009-03-07 Well Log Performed
2009-03-07 Well Mode changed to Abandoned Zone
2009-06-01 Well Abandoned
2009-06-01 Well Fluid changed to Crude Oil
2009-06-01 Well Mode changed to Abandoned

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-07 349.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-10-25 Perforation 914.00 917.00 17
2009-03-07 Packing Device Capped w/Cement 896.50 904.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 611 0.0 0.0 0.0
1995 6806 0.0 0.0 0.0
1996 308 0.0 0.0 0.0

For data sources see[6]

References