X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404081411000

Well Details

Well ID: 0404081411000
Loading map...
Location: 00/11-14-040-08W4/0
Location Alias: 00/11-14-40-08 W4M
Location Alias 2: 00/11-14-040-08 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 08
Section: 14
County/Municipality: Municipal District of Provost No. 52
Well Name: CABRE ET AL PROVOST 11-14-40-8
Operator Name: Enerplus Corporation
License Number: 0102117
License Date: 1983-07-07
License Status: RecCertified
Spud Date: 1983-08-18
Final Drill Date: 1983-08-20
Well Total Depth: 951.00 m
Surface Hole Latitude: 52.443893
Surface Hole Longitude: -111.049257

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-07-07 Obtained License
1983-08-20 Finished Drilling
1983-08-21 Production Casing Operation Performed
1983-09-30 Perforation Treatment Performed - Jet Perforation
1983-10-04 Well Mode changed to Drilled and Cased
1987-09-10 Well Began Production
1987-09-10 Well Fluid changed to Gas
1987-09-10 Well Mode changed to Flowing
1989-03-01 Well Fluid changed to Gas
1989-03-01 Well Mode changed to Suspended
1992-06-01 Well Fluid changed to Gas
1992-06-01 Well Mode changed to Flowing
1997-09-30 Well Fluid changed to Gas
1997-09-30 Well Mode changed to Suspended
2000-05-17 Well Log Performed
2000-05-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2000-05-18 Plug Back Performed
2000-05-18 Well Log Performed
2000-05-19 Perforation Treatment Performed - Jet Perforation
2000-05-19 Perforation Treatment Performed - Remedial Casing
2000-05-19 Well Log Performed
2000-05-21 Well Abandoned
2000-05-21 Well Fluid changed to Gas
2000-05-21 Well Mode changed to Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-09-30 Perforation 881.00 882.00 14
1983-09-30 Perforation 881.00 882.00 0
2000-05-18 Packing Device Capped w/Cement 870.00 878.00 0
2000-05-19 Perforation 275.00 275.30 17
2000-05-19 Remedial Casing Cementing 275.00 275.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1987 2427 0.0 0.0 0.0
1988 3702 0.0 0.0 0.0
1992 5136 0.0 0.0 0.0
1993 8682 0.0 0.0 0.0
1994 8442 0.0 0.0 0.0
1995 8389 0.0 0.0 0.0

For data sources see[5]

References