X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404032611020

Well Details

Well ID: 0404032611020
Loading map...
Location: 02/11-26-040-03W4/0
Location Alias: 02/11-26-40-03 W4M
Location Alias 2: 02/11-26-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 26
County/Municipality: Municipal District of Provost No. 52
Well Name: COYOTE PROVO 11-26-40-3
Operator Name: Harvest Operations Corp.
License Number: 0103157
License Date: 1983-09-19
License Status: Suspension
Spud Date: 1983-10-08
Final Drill Date: 1983-10-11
Well Total Depth: 811.00 m
Surface Hole Latitude: 52.472994
Surface Hole Longitude: -110.331839

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1983-09-19 Obtained License
1983-10-11 Finished Drilling
1983-10-12 Production Casing Operation Performed
1983-10-12 Well Mode changed to Drilled and Cased
1983-10-17 Well Log Performed
1983-10-20 Perforation Treatment Performed - Jet Perforation
1984-04-17 Perforation Treatment Performed - Jet Perforation
1984-04-17 Well Log Performed
1984-04-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1984-07-28 Well Began Injection
1984-07-28 Well Fluid changed to Water
1984-07-28 Well Type changed to Disposal
1984-08-15 Perforation Treatment Performed - Jet Perforation
1984-08-15 Well Log Performed
2019-04-01 Well Fluid changed to Water
2019-04-01 Well Mode changed to Suspended
2019-04-01 Well Type changed to Disposal
2019-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-27 Perforation Treatment Performed - Jet Perforation
2019-10-27 Plug Back Performed
2019-10-27 Well Fluid changed to Water
2019-10-27 Well Mode changed to Abandoned Zone
2019-10-27 Well Type changed to Disposal
2019-10-28 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-10-28 Perforation Treatment Performed - Cement Squeeze
2019-10-28 Plug Back Performed
2019-10-30 Perforation Treatment Performed - Jet Perforation
2019-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2019-11-01 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1983-10-20 Perforation 778.00 780.00 13
2019-10-30 Perforation 193.00 194.00 18
2019-11-01 Packing Device Capped w/Cement 169.00 189.00 0
1984-04-17 Perforation 787.00 790.00 13
1984-04-18 Acid Treatment 787.00 790.00 0
1984-08-15 Perforation 787.00 790.00 13
1984-08-15 Perforation 790.00 795.00 26
2019-10-27 Packing Device Capped w/Cement 760.00 770.00 0
2019-10-27 Perforation 256.00 257.00 17
2019-10-28 Cement Squeeze 256.00 257.00 0
2019-10-28 Packing Device Capped w/Cement 230.00 252.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1984 0 0.0 0.0 0.0
1985 0 0.0 0.0 0.0
1986 0 0.0 0.0 0.0
1987 0 0.0 0.0 0.0
1988 0 0.0 0.0 0.0
1989 0 0.0 0.0 0.0
1990 0 0.0 0.0 0.0
1991 0 0.0 0.0 0.0
1993 0 0.0 0.0 0.0
1994 0 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0
2001 0 0.0 0.0 0.0
2002 0 0.0 0.0 0.0
2003 0 0.0 0.0 0.0
2004 0 0.0 0.0 0.0
2005 0 0.0 0.0 0.0
2006 0 0.0 0.0 0.0
2007 0 0.0 0.0 0.0
2008 0 0.0 0.0 0.0
2009 0 0.0 0.0 0.0
2010 0 0.0 0.0 0.0
2011 0 0.0 0.0 0.0
2012 0 0.0 0.0 0.0
2013 0 0.0 0.0 0.0
2014 0 0.0 0.0 0.0
2015 0 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2019-11-01 No Incident Encountered 0.00 0.00

For data sources see[6]

References