X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031210C00

Well Details

Well ID: 0404031210C00
Loading map...
Location: C0/10-12-040-03W4/0
Location Alias: C0/10-12-40-03 W4M
Location Alias 2: C0/10-12-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 10-12-40-3
Operator Name: Surge Energy Inc.
License Number: 0151999
License Date: 1992-03-13
License Status: Suspension
Spud Date: 1992-05-03
Final Drill Date: 1992-05-05
Well Total Depth: 873.00 m
Surface Hole Latitude: 52.430216
Surface Hole Longitude: -110.301978

For data sources see[1][2]

Well History

Date Event
1992-03-13 Obtained License
1992-05-03 Surface Casing Operation Performed
1992-05-05 Finished Drilling
1992-05-05 Production Casing Operation Performed
1992-05-05 Rig Released
1992-05-05 Well Log Performed
1992-05-05 Well Mode changed to Drilled and Cased
1992-05-07 Perforation Treatment Performed - Jet Perforation
1992-05-14 Well Began Production
1992-05-14 Well Fluid changed to Crude Oil
1992-05-14 Well Mode changed to Pumping
1994-04-19 Perforation Treatment Performed - Jet Perforation
1994-04-19 Well Log Performed
1994-04-30 Well Fluid changed to Crude Oil
1994-04-30 Well Mode changed to Suspended
1994-06-23 Well Log Performed
1994-08-01 Well Began Injection
1994-08-01 Well Fluid changed to Water
1994-08-01 Well Type changed to Disposal
1995-04-25 Perforation Treatment Performed - Cement Squeeze
1995-04-25 Plug Back Performed
1995-04-25 Well Fluid changed to Water
1995-04-25 Well Mode changed to Abandoned Zone
1995-04-25 Well Type changed to Disposal
1995-04-28 Perforation Treatment Performed - Jet Perforation
1995-04-28 Well Log Performed
2006-10-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-05-07 Perforation 792.50 793.50 13
1994-04-19 Perforation 792.00 796.00 17
1995-04-25 Cement Squeeze 792.50 796.00 0
1995-04-28 Perforation 815.00 820.00 13
1995-04-28 Perforation 835.00 840.00 13
2006-10-30 Packing Device Capped w/Cement 797.30 805.30 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5183 0.0 0.0 0.0
1993 8348 0.0 0.0 0.0
1994 1776 0.0 0.0 0.0
1995 0 0.0 0.0 0.0

For data sources see[5]

References