X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031209A22

Well Details

Well ID: 0404031209A22
Loading map...
Location: A2/09-12-040-03W4/2
Location Alias: A2/09-12-40-03 W4M
Location Alias 2: A2/09-12-040-03 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 9-12-40-3
Operator Name: Surge Energy Inc.
License Number: 0167240
License Date: 1994-05-18
License Status: Suspension
Spud Date: 1994-08-23
Final Drill Date: 1994-08-26
Well Total Depth: 966.00 m
Surface Hole Latitude: 52.425265
Surface Hole Longitude: -110.294188

For data sources see[1][2]

Well History

Date Event
1994-05-18 Obtained License
1994-08-24 Direction Drilling Operation Performed - Deviate
1994-08-24 Surface Casing Operation Performed
1994-08-26 Finished Drilling
1994-08-26 Well Mode changed to Drilled and Cased
1994-08-28 Production Casing Operation Performed
1994-08-28 Rig Released
1994-08-28 Well Log Performed
1994-09-01 Perforation Treatment Performed - Jet Perforation
1994-10-29 Well Log Performed
1999-11-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1999-11-18 Plug Back Performed
1999-11-18 Well Mode changed to Drilled and Cased
1999-11-19 Perforation Treatment Performed - Jet Perforation
2007-07-27 Perforation Treatment Performed - Jet Perforation
2007-07-27 Well Log Performed
2007-08-07 Perforation Treatment Performed - Fractured
2008-04-01 Well Began Production
2008-04-01 Well Fluid changed to Crude Oil
2008-04-01 Well Mode changed to Pumping
2010-10-12 Well Fluid changed to Crude Oil
2010-10-12 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-08-24 232.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-01 Perforation 872.00 874.00 13
1999-11-18 Packing Device Capped w/Cement 860.00 868.00 0
1999-11-19 Perforation 832.00 833.00 13
2007-07-27 Perforation 833.00 835.00 17
2007-08-07 Fracture 832.00 833.00 0
2007-08-07 Fracture 833.00 835.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 5928 0.0 0.0 0.0
2009 1224 0.0 0.0 0.0

For data sources see[6]

References