X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031207A00

Well Details

Well ID: 0404031207A00
Loading map...
Location: A0/07-12-040-03W4/0
Location Alias: A0/07-12-40-03 W4M
Location Alias 2: A0/07-12-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 12
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 7-12-40-3
Operator Name: Surge Energy Inc.
License Number: 0152163
License Date: 1992-04-02
License Status: Suspension
Spud Date: 1992-05-25
Final Drill Date: 1992-05-26
Well Total Depth: 870.00 m
Surface Hole Latitude: 52.423112
Surface Hole Longitude: -110.299036

For data sources see[1][2]

Well History

Date Event
1992-04-02 Obtained License
1992-05-25 Surface Casing Operation Performed
1992-05-26 Finished Drilling
1992-05-26 Well Log Performed
1992-05-26 Well Mode changed to Drilled and Cased
1992-05-27 Production Casing Operation Performed
1992-05-27 Rig Released
1992-06-01 Perforation Treatment Performed - Jet Perforation
1992-06-02 Well Began Production
1992-06-02 Well Fluid changed to Crude Oil
1992-06-02 Well Mode changed to Pumping
1994-07-31 Well Fluid changed to Crude Oil
1994-07-31 Well Mode changed to Suspended
1994-09-14 Perforation Treatment Performed - Cement Squeeze
1994-09-17 Perforation Treatment Performed - Jet Perforation
1994-09-17 Well Log Performed
1994-11-09 Well Began Injection
1994-11-09 Well Fluid changed to Water
1994-11-09 Well Type changed to Injection
1996-02-28 Perforation Treatment Performed - Jet Perforation
2000-05-20 Well Fluid changed to Water
2000-05-20 Well Mode changed to Suspended
2000-05-20 Well Type changed to Injection
2006-10-27 Perforation Treatment Performed - Bridge Plug Capped W/Cement

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-06-01 Perforation 789.50 790.50 13
1994-09-14 Cement Squeeze 789.50 790.50 0
1994-09-17 Perforation 792.00 796.00 17
1996-02-28 Perforation 790.00 795.00 13
2006-10-27 Packing Device Capped w/Cement 772.00 780.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 4859 0.0 0.0 0.0
1993 8098 0.0 0.0 0.0
1994 2088 0.0 0.0 0.0
1995 0 0.0 0.0 0.0
1996 0 0.0 0.0 0.0
1997 0 0.0 0.0 0.0
1998 0 0.0 0.0 0.0
1999 0 0.0 0.0 0.0
2000 0 0.0 0.0 0.0

For data sources see[5]

References