X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031012A20

Well Details

Well ID: 0404031012A20
Loading map...
Location: A2/12-10-040-03W4/0
Location Alias: A2/12-10-40-03 W4M
Location Alias 2: A2/12-10-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 12-10-40-3
Operator Name: Surge Energy Inc.
License Number: 0152014
License Date: 1992-03-16
License Status: Suspension
Spud Date: 1992-05-13
Final Drill Date: 1992-05-15
Well Total Depth: 862.00 m
Surface Hole Latitude: 52.426813
Surface Hole Longitude: -110.359465

For data sources see[1][2]

Well History

Date Event
1992-03-16 Obtained License
1992-05-14 Surface Casing Operation Performed
1992-05-15 Finished Drilling
1992-05-15 Production Casing Operation Performed
1992-05-15 Rig Released
1992-05-15 Well Log Performed
1992-05-15 Well Mode changed to Drilled and Cased
1992-05-20 Perforation Treatment Performed - Jet Perforation
1992-06-01 Well Began Production
1992-06-01 Well Fluid changed to Crude Oil
1992-06-01 Well Mode changed to Pumping
1994-04-14 Perforation Treatment Performed - Jet Perforation
1997-08-01 Well Fluid changed to Crude Oil
1997-08-01 Well Mode changed to Suspended
1997-10-16 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1997-10-16 Perforation Treatment Performed - Jet Perforation
1997-10-16 Plug Back Performed
1997-10-16 Well Fluid changed to Crude Oil
1997-10-16 Well Mode changed to Abandoned Zone
2005-09-20 Perforation Treatment Performed - Cement Squeeze
2005-09-20 Plug Back Performed
2005-09-28 Perforation Treatment Performed - Jet Perforation
2005-09-28 Well Log Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1992-05-20 Perforation 820.50 822.00 13
1994-04-14 Perforation 820.50 825.50 13
1997-10-16 Packing Device Capped w/Cement 807.00 815.00 0
1997-10-16 Perforation 719.00 721.00 13
2005-09-20 Cement Squeeze 719.00 721.00 0
2005-09-28 Perforation 773.00 774.50 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1992 5129 0.0 0.0 0.0
1993 8433 0.0 0.0 0.0
1994 8661 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 8693 0.0 0.0 0.0
1997 4331 0.0 0.0 0.0

For data sources see[5]

References