X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031006B00

Well Details

Well ID: 0404031006B00
Loading map...
Location: B0/06-10-040-03W4/0
Location Alias: B0/06-10-40-03 W4M
Location Alias 2: B0/06-10-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 6-10-40-3
Operator Name: Surge Energy Inc.
License Number: 0073652
License Date: 1978-12-27
License Status: Suspension
Spud Date: 1979-05-12
Final Drill Date: 1979-05-17
Well Total Depth: 906.00 m
Surface Hole Latitude: 52.424030
Surface Hole Longitude: -110.356204

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1978-12-27 Obtained License
1979-05-17 Finished Drilling
1979-05-17 Well Mode changed to Drilled and Cased
1979-05-19 Drill Stem Test Performed
1979-05-20 Production Casing Operation Performed
1979-09-21 Perforation Treatment Performed - Jet Perforation
1979-09-22 Perforation Treatment Performed - Acid Squeeze - Press Used
1979-09-27 Well Began Production
1979-09-27 Well Fluid changed to Crude Oil
1979-09-27 Well Mode changed to Pumping
1997-02-11 Well Fluid changed to Crude Oil
1997-02-11 Well Mode changed to Suspended
1999-08-18 Perforation Treatment Performed - Jet Perforation
1999-08-18 Well Fluid changed to Crude Oil
1999-08-18 Well Log Performed
1999-08-18 Well Mode changed to Suspended
2004-09-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2004-09-02 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-09-21 Perforation 831.50 839.00 7
1979-09-22 Acid Treatment 831.50 839.00 0
1999-08-18 Perforation 827.50 829.00 13
2004-09-02 Packing Dev Cpd w/Res-Gyp Cem 828.00 831.00 0
2004-09-02 Packing Device Capped w/Cement 812.50 820.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1979 844 0.0 0.0 0.0
1980 2391 0.0 0.0 0.0
1981 3117 0.0 0.0 0.0
1982 6295 0.0 0.0 0.0
1983 5935 0.0 0.0 0.0
1984 5760 0.0 0.0 0.0
1985 7554 0.0 0.0 0.0
1986 8667 0.0 0.0 0.0
1987 8640 0.0 0.0 0.0
1988 8705 0.0 0.0 0.0
1989 8640 0.0 0.0 0.0
1990 8488 0.0 0.0 0.0
1991 8194 0.0 0.0 0.0
1992 8388 0.0 0.0 0.0
1993 8478 0.0 0.0 0.0
1994 8668 0.0 0.0 0.0
1995 8695 0.0 0.0 0.0
1996 8669 0.0 0.0 0.0
1997 772 0.0 0.0 0.0

For data sources see[5]

References