X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404031004C20

Well Details

Well ID: 0404031004C20
Loading map...
Location: C2/04-10-040-03W4/0
Location Alias: C2/04-10-40-03 W4M
Location Alias 2: C2/04-10-040-03 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 03
Section: 10
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 4-10-40-3
Operator Name: Surge Energy Inc.
License Number: 0175817
License Date: 1995-02-07
License Status: Suspension
Spud Date: 1995-02-19
Final Drill Date: 1995-02-22
Well Total Depth: 896.00 m
Surface Hole Latitude: 52.422861
Surface Hole Longitude: -110.363200

For data sources see[1][2]

Well History

Date Event
1995-02-07 Obtained License
1995-02-20 Surface Casing Operation Performed
1995-02-21 Direction Drilling Operation Performed - Deviate
1995-02-22 Finished Drilling
1995-02-22 Well Log Performed
1995-02-22 Well Mode changed to Drilled and Cased
1995-02-23 Production Casing Operation Performed
1995-02-23 Rig Released
1995-03-01 Perforation Treatment Performed - Jet Perforation
1995-03-03 Well Began Production
1995-03-03 Well Fluid changed to Crude Oil
1995-03-03 Well Mode changed to Pumping
1995-05-04 Well Log Performed
1998-03-10 Well Fluid changed to Crude Oil
1998-03-10 Well Mode changed to Suspended
2004-08-30 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2012-05-30 Perforation Treatment Performed - Jet Perforation
2012-06-01 Perforation Treatment Performed - Cement Squeeze
2012-06-04 Perforation Treatment Performed - Jet Perforation
2012-06-04 Well Log Performed
2012-11-06 Well Fluid changed to Crude Oil
2012-11-06 Well Mode changed to Pumping
2015-08-07 Well Fluid changed to Crude Oil
2015-08-07 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1995-02-21 364.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1995-03-01 Perforation 837.00 839.00 13
1995-03-01 Perforation 841.00 842.50 13
2004-08-30 Packing Device Capped w/Cement 822.00 830.00 0
2012-05-30 Perforation 837.00 839.00 17
2012-05-30 Perforation 841.00 842.50 17
2012-06-01 Cement Squeeze 837.00 839.00 0
2012-06-01 Cement Squeeze 841.00 842.50 0
2012-06-04 Perforation 837.00 839.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1995 7174 0.0 0.0 0.0
1996 8513 0.0 0.0 0.0
1997 6023 0.0 0.0 0.0
2012 1200 0.0 0.0 0.0
2013 8719 0.0 0.0 0.0
2014 5328 0.0 0.0 0.0

For data sources see[6]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2012-06-10 No Incident Encountered 0.00 0.00

For data sources see[7]

References