X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404020612030

Well Details

Well ID: 0404020612030
Loading map...
Location: 03/12-06-040-02W4/0
Location Alias: 03/12-06-40-02 W4M
Location Alias 2: 03/12-06-040-02 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 02
Section: 06
County/Municipality: Municipal District of Provost No. 52
Well Name: SURGE ENERGY PROVOST 12-6-40-2
Operator Name: Surge Energy Inc.
License Number: 0167251
License Date: 1994-05-18
License Status: Suspension
Spud Date: 1994-09-09
Final Drill Date: 1994-09-11
Well Total Depth: 889.00 m
Surface Hole Latitude: 52.413408
Surface Hole Longitude: -110.291451

For data sources see[1][2]

Well History

Date Event
1994-05-18 Obtained License
1994-09-09 Surface Casing Operation Performed
1994-09-10 Direction Drilling Operation Performed - Deviate
1994-09-11 Finished Drilling
1994-09-11 Well Mode changed to Drilled and Cased
1994-09-12 Production Casing Operation Performed
1994-09-12 Well Log Performed
1994-09-13 Rig Released
1994-09-17 Perforation Treatment Performed - Jet Perforation
1994-09-20 Well Began Production
1994-09-20 Well Fluid changed to Crude Oil
1994-09-20 Well Mode changed to Pumping
1994-11-21 Well Log Performed
1996-02-20 Perforation Treatment Performed - Jet Perforation
1996-02-21 Perforation Treatment Performed - Cement Squeeze
1996-02-24 Perforation Treatment Performed - Jet Perforation
2006-11-21 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2006-11-21 Plug Back Performed
2006-11-21 Well Fluid changed to Crude Oil
2006-11-21 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1994-09-10 233.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1994-09-17 Perforation 802.00 803.50 13
1996-02-20 Perforation 805.00 806.00 13
1996-02-21 Cement Squeeze 802.00 806.00 0
1996-02-24 Perforation 802.00 803.50 13
2006-11-21 Packing Device Capped w/Cement 790.50 798.50 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1994 2323 0.0 0.0 0.0
1995 8688 0.0 0.0 0.0
1996 7625 0.0 0.0 0.0
1997 8606 0.0 0.0 0.0
1998 8673 0.0 0.0 0.0
1999 8233 0.0 0.0 0.0
2000 8675 0.0 0.0 0.0
2001 8729 0.0 0.0 0.0
2002 3755 0.0 0.0 0.0

For data sources see[6]

References