If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0404013507070 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.482587,"lon":-110.049414,"icon":""}]} |
Location: 07/07-35-040-01W4/0 | |
Location Alias: 07/07-35-40-01 W4M | |
Location Alias 2: 07/07-35-040-01 W4/00 | |
Country: Canada | |
Province: Alberta | |
Township: 040 | |
Meridian: 4 | |
Range: 01 | |
Section: 35 | |
County/Municipality: Municipal District of Provost No. 52 | |
Well Name: ANADARKO 7C3 HZL HAYTER 7-35-40-1 | |
Operator Name: Harvest Operations Corp. | |
License Number: 0255711 | |
License Date: 2001-06-01 | |
License Status: Issued | |
Spud Date: 2001-06-29 | |
Final Drill Date: 2001-07-03 | |
Well Total Depth: 1423.00 m | |
Surface Hole Latitude: 52.482587 | |
Surface Hole Longitude: -110.049414 |
Date | Event |
---|---|
2001-06-01 | Obtained License |
2001-06-29 | Surface Casing Operation Performed |
2001-07-01 | Direction Drilling Operation Performed - Horizontal |
2001-07-02 | Well Log Performed |
2001-07-03 | Finished Drilling |
2001-07-04 | Intermediate Casing Operation Performed |
2001-07-04 | Liner Casing Operation Performed |
2001-07-04 | Perforation Treatment Performed - Slotted Liner or Casing |
2001-07-04 | Rig Released |
2001-07-04 | Well Log Performed |
2001-07-04 | Well Mode changed to Drilled and Cased |
2001-07-12 | Well Log Performed |
2001-07-16 | Well Began Production |
2001-07-16 | Well Fluid changed to Crude Oil |
2001-07-16 | Well Mode changed to Pumping |
2005-09-01 | Well Fluid changed to Crude Oil |
2005-09-01 | Well Mode changed to Suspended |
2011-10-17 | Well Fluid changed to Crude Oil |
2011-10-17 | Well Mode changed to Pumping |
For data sources see[3]
Start Date | Depth (m) | Reason |
---|---|---|
2001-07-01 | 625.00 | Horizontal |
For data sources see[4]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
2001-07-04 | Slotted Liner | 848.00 | 1423.00 | 0 |
For data sources see[5]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2001 | 4065 | 0.0 | 0.0 | 0.0 |
2002 | 8591 | 0.0 | 0.0 | 0.0 |
2003 | 6765 | 0.0 | 0.0 | 0.0 |
2004 | 24 | 0.0 | 0.0 | 0.0 |
2011 | 342 | 0.0 | 0.0 | 0.0 |
2012 | 6668 | 0.0 | 0.0 | 0.0 |
2013 | 7231 | 0.0 | 0.0 | 0.0 |
2014 | 7925 | 0.0 | 0.0 | 0.0 |
2015 | 5311 | 0.0 | 0.0 | 0.0 |
2016 | 6821 | 0.0 | 0.0 | 0.0 |
2017 | 8000 | 0.0 | 0.0 | 0.0 |
2018 | 8432 | 0.0 | 0.0 | 0.0 |
2019 | 2351 | 0.0 | 0.0 | 0.0 |
For data sources see[6]