X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012904D22

Well Details

Well ID: 0404012904D22
Loading map...
Location: D2/04-29-040-01W4/2
Location Alias: D2/04-29-40-01 W4M
Location Alias 2: D2/04-29-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE D2 HAYTER 4-29-40-1
Operator Name: Harvest Operations Corp.
License Number: 0188719
License Date: 1996-06-14
License Status: Suspension
Spud Date: 1996-07-02
Final Drill Date: 1996-07-04
Well Total Depth: 812.00 m
Surface Hole Latitude: 52.466968
Surface Hole Longitude: -110.120991

For data sources see[1][2]

Well History

Date Event
1996-06-14 Obtained License
1996-07-02 Surface Casing Operation Performed
1996-07-03 Direction Drilling Operation Performed - Deviate
1996-07-04 Finished Drilling
1996-07-04 Well Log Performed
1996-07-04 Well Mode changed to Drilled and Cased
1996-07-05 Production Casing Operation Performed
1996-07-05 Rig Released
1996-07-08 Well Log Performed
1997-05-06 Well Log Performed
1997-05-07 Perforation Treatment Performed - Jet Perforation
1997-05-27 Perforation Treatment Performed - Jet Perforation
1997-05-27 Well Log Performed
1998-10-28 Perforation Treatment Performed - Jet Perforation
1998-10-28 Well Log Performed
2008-06-18 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-18 Perforation Treatment Performed - Jet Perforation
2008-06-18 Plug Back Performed
2008-06-18 Well Log Performed
2008-06-24 Perforation Treatment Performed - Fractured
2008-07-01 Well Began Production
2008-07-01 Well Fluid changed to Crude Oil
2008-07-01 Well Mode changed to Pumping
2016-09-27 Well Fluid changed to Crude Oil
2016-09-27 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1996-07-03 97.50 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1997-05-07 Perforation 770.50 773.50 13
1997-05-27 Perforation 777.00 780.00 13
1997-05-27 Perforation 774.00 775.50 13
1998-10-28 Perforation 777.00 779.00 13
1998-10-28 Perforation 771.00 775.50 13
2008-06-18 Packing Device Capped w/Cement 757.00 765.00 0
2008-06-18 Perforation 729.30 731.00 17
2008-06-24 Fracture 729.30 731.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2008 247 0.0 0.0 0.0
2009 4518 0.0 0.0 0.0
2010 7145 0.0 0.0 0.0
2011 8323 0.0 0.0 0.0
2012 8317 0.0 0.0 0.0
2013 7901 0.0 0.0 0.0
2014 2098 0.0 0.0 0.0
2015 48 0.0 0.0 0.0

For data sources see[6]

References