X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012904D00

Well Details

Well ID: 0404012904D00
Loading map...
Location: D0/04-29-040-01W4/0
Location Alias: D0/04-29-40-01 W4M
Location Alias 2: D0/04-29-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE 4D HAYTER 4-29-40-1
Operator Name: Harvest Operations Corp.
License Number: 0144494
License Date: 1990-06-18
License Status: Suspension
Spud Date: 1990-07-10
Final Drill Date: 1990-07-13
Well Total Depth: 861.00 m
Surface Hole Latitude: 52.465968
Surface Hole Longitude: -110.116932

For data sources see[1][2]

Well History

Date Event
1990-06-18 Obtained License
1990-07-11 Direction Drilling Operation Performed - Deviate
1990-07-11 Surface Casing Operation Performed
1990-07-13 Finished Drilling
1990-07-13 Well Log Performed
1990-07-13 Well Mode changed to Drilled and Cased
1990-07-14 Production Casing Operation Performed
1990-07-14 Rig Released
1990-08-17 Well Log Performed
1990-08-19 Perforation Treatment Performed - Jet Perforation
1990-08-20 Well Log Performed
1990-08-21 Perforation Treatment Performed - Jet Perforation
1990-08-24 Well Log Performed
1990-09-13 Well Began Production
1990-09-13 Well Fluid changed to Crude Oil
1990-09-13 Well Mode changed to Pumping
1993-09-30 Well Fluid changed to Crude Oil
1993-09-30 Well Mode changed to Suspended
1997-11-20 Well Fluid changed to Crude Oil
1997-11-20 Well Mode changed to Pumping
1999-09-16 Perforation Treatment Performed - Jet Perforation
1999-09-16 Well Log Performed
2005-09-01 Well Fluid changed to Crude Oil
2005-09-01 Well Mode changed to Suspended
2007-03-16 Perforation Treatment Performed - Jet Perforation
2007-03-20 Well Fluid changed to Crude Oil
2007-03-20 Well Mode changed to Pumping
2009-02-04 Well Log Performed
2010-09-20 Well Log Performed
2011-11-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-11-01 Perforation Treatment Performed - Jet Perforation
2011-11-01 Plug Back Performed
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Log Performed
2011-11-01 Well Mode changed to Abandoned Zone

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-07-11 180.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-19 Perforation 815.50 816.50 13
1990-08-19 Perforation 819.00 821.00 13
1990-08-21 Perforation 822.50 825.00 13
1999-09-16 Perforation 825.00 831.50 17
2007-03-16 Perforation 816.50 818.00 17
2011-11-01 Packing Device Capped w/Cement 795.00 807.00 0
2011-11-01 Perforation 720.50 722.00 17
2011-11-01 Perforation 719.40 720.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2288 0.0 0.0 0.0
1991 8567 0.0 0.0 0.0
1992 8107 0.0 0.0 0.0
1993 24 0.0 0.0 0.0
1997 934 0.0 0.0 0.0
1998 8508 0.0 0.0 0.0
1999 8232 0.0 0.0 0.0
2000 8226 0.0 0.0 0.0
2001 6952 0.0 0.0 0.0
2002 3315 0.0 0.0 0.0
2007 6093 0.0 0.0 0.0
2008 6942 0.0 0.0 0.0
2009 5110 0.0 0.0 0.0
2010 773 0.0 0.0 0.0
2011 360 0.0 0.0 0.0

For data sources see[6]

References