X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012904B03

Well Details

Well ID: 0404012904B03
Loading map...
Location: B0/04-29-040-01W4/3
Location Alias: B0/04-29-40-01 W4M
Location Alias 2: B0/04-29-040-01 W4/03
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE HAYTER B 4-29-40-1
Operator Name: Harvest Operations Corp.
License Number: 0144377
License Date: 1990-06-07
License Status: Suspension
Spud Date: 1990-06-29
Final Drill Date: 1990-07-02
Well Total Depth: 891.00 m
Surface Hole Latitude: 52.462044
Surface Hole Longitude: -110.123260

For data sources see[1][2]

Well History

Date Event
1990-06-07 Obtained License
1990-06-30 Direction Drilling Operation Performed - Deviate
1990-06-30 Surface Casing Operation Performed
1990-07-02 Finished Drilling
1990-07-02 Well Mode changed to Drilled and Cased
1990-07-03 Production Casing Operation Performed
1990-07-03 Rig Released
1990-07-03 Well Log Performed
1990-07-29 Well Log Performed
1990-08-01 Perforation Treatment Performed - Jet Perforation
1990-08-01 Well Log Performed
1990-08-24 Well Log Performed
1999-09-29 Perforation Treatment Performed - Jet Perforation
1999-09-29 Well Log Performed
2003-07-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-07-15 Perforation Treatment Performed - Jet Perforation
2003-07-15 Plug Back Performed
2004-03-31 Perforation Treatment Performed - Fractured
2009-02-07 Perforation Treatment Performed - Jet Perforation
2010-10-04 Perforation Treatment Performed - Jet Perforation
2010-10-05 Perforation Treatment Performed - Jet Perforation
2011-10-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-25 Perforation Treatment Performed - Packing Dev CPD W/Res-GYP Cem
2011-10-25 Plug Back Performed
2011-10-26 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2011-10-26 Perforation Treatment Performed - Jet Perforation
2011-10-26 Plug Back Performed
2011-10-26 Well Log Performed
2011-11-01 Well Began Production
2011-11-01 Well Fluid changed to Crude Oil
2011-11-01 Well Mode changed to Pumping
2016-09-27 Well Fluid changed to Crude Oil
2016-09-27 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-06-30 180.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-01 Perforation 848.50 852.00 13
2010-10-04 Perforation 857.00 859.00 1
2010-10-05 Perforation 848.20 849.80 17
2010-10-05 Perforation 850.30 852.00 17
2011-10-25 Packing Device Capped w/Cement 829.80 839.80 0
2011-10-25 Packing Dev Cpd w/Res-Gyp Cem 784.00 788.00 0
2011-10-26 Packing Device Capped w/Cement 769.00 779.00 0
2011-10-26 Perforation 735.00 738.40 17
1990-08-01 Perforation 853.00 855.50 13
1999-09-29 Perforation 848.00 855.00 14
1999-09-29 Perforation 857.00 859.00 14
2003-07-15 Packing Device Capped w/Cement 834.00 846.00 0
2003-07-15 Perforation 781.50 783.00 17
2004-03-31 Fracture 781.50 783.00 0
2009-02-07 Perforation 790.00 792.00 17
2010-10-04 Perforation 848.50 855.50 1

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2011 905 0.0 0.0 0.0
2012 4967 0.0 0.0 0.0
2013 6182 0.0 0.0 0.0
2014 6830 0.0 0.0 0.0
2015 3108 0.0 0.0 0.0

For data sources see[6]

References