X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012903B00

Well Details

Well ID: 0404012903B00
Loading map...
Location: B0/03-29-040-01W4/0
Location Alias: B0/03-29-40-01 W4M
Location Alias 2: B0/03-29-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 29
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE HAYTER B 3-29-40-1
Operator Name: Harvest Operations Corp.
License Number: 0144136
License Date: 1990-05-11
License Status: Suspension
Spud Date: 1990-07-05
Final Drill Date: 1990-07-09
Well Total Depth: 815.00 m
Surface Hole Latitude: 52.465878
Surface Hole Longitude: -110.116932

For data sources see[1][2]

Well History

Date Event
1990-05-11 Obtained License
1990-07-06 Surface Casing Operation Performed
1990-07-07 Direction Drilling Operation Performed - Deviate
1990-07-09 Finished Drilling
1990-07-09 Well Log Performed
1990-07-09 Well Mode changed to Drilled and Cased
1990-07-10 Production Casing Operation Performed
1990-07-10 Rig Released
1990-08-09 Well Log Performed
1990-08-10 Perforation Treatment Performed - Jet Perforation
1990-08-24 Well Log Performed
1990-09-13 Well Began Production
1990-09-13 Well Fluid changed to Crude Oil
1990-09-13 Well Mode changed to Pumping
1993-09-30 Well Fluid changed to Crude Oil
1993-09-30 Well Mode changed to Suspended
1994-09-08 Well Fluid changed to Crude Oil
1994-09-08 Well Mode changed to Pumping
1994-11-01 Well Fluid changed to Crude Oil
1994-11-01 Well Mode changed to Suspended
1997-11-20 Well Fluid changed to Crude Oil
1997-11-20 Well Mode changed to Pumping
2008-07-17 Well Fluid changed to Crude Oil
2008-07-17 Well Mode changed to Suspended
2010-06-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-14 Perforation Treatment Performed - Jet Perforation
2010-06-14 Plug Back Performed
2010-06-14 Well Fluid changed to Crude Oil
2010-06-14 Well Log Performed
2010-06-14 Well Mode changed to Abandoned Zone
2010-06-15 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2010-06-15 Plug Back Performed

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1990-07-07 250.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1990-08-10 Perforation 787.70 790.00 13
2010-06-14 Packing Device Capped w/Cement 773.00 783.00 0
2010-06-14 Perforation 738.00 740.00 17
2010-06-15 Packing Device Capped w/Cement 725.00 735.00 0

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1990 2487 0.0 0.0 0.0
1991 1937 0.0 0.0 0.0
1997 934 0.0 0.0 0.0
1998 8331 0.0 0.0 0.0
1999 7832 0.0 0.0 0.0
2000 7964 0.0 0.0 0.0
2001 6499 0.0 0.0 0.0
2005 6268 0.0 0.0 0.0

For data sources see[6]

References