X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012507002

Well Details

Well ID: 0404012507002
Loading map...
Location: 00/07-25-040-01W4/2
Location Alias: 00/07-25-40-01 W4M
Location Alias 2: 00/07-25-040-01 W4/02
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 25
County/Municipality: Municipal District of Provost No. 52
Well Name: NORCENINT ET AL HAYTER 7-25-40-1
Operator Name: Harvest Operations Corp.
License Number: 0077637
License Date: 1979-08-22
License Status: Suspension
Spud Date: 1979-08-24
Final Drill Date: 1979-08-28
Well Total Depth: 825.00 m
Surface Hole Latitude: 52.468470
Surface Hole Longitude: -110.013730

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-08-22 Obtained License
1979-08-28 Finished Drilling
1979-08-28 Well Mode changed to Drilled and Cased
1979-08-29 Drill Stem Test Performed
1979-08-30 Production Casing Operation Performed
1979-12-11 Perforation Treatment Performed - Jet Perforation
1995-04-20 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1995-04-20 Perforation Treatment Performed - Jet Perforation
1995-04-20 Plug Back Performed
1997-10-11 Perforation Treatment Performed - Cement Squeeze
1997-10-11 Plug Back Performed
1997-10-11 Well Mode changed to Abandoned Zone
1997-10-16 Perforation Treatment Performed - Jet Perforation
2010-03-10 Perforation Treatment Performed - Jet Perforation
2010-03-10 Well Log Performed
2010-03-11 Perforation Treatment Performed - Remedial Casing
2010-03-13 Perforation Treatment Performed - Jet Perforation

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-12-11 Perforation 751.00 755.00 7
1995-04-20 Packing Device Capped w/Cement 733.00 741.00 0
1995-04-20 Perforation 708.00 709.00 13
1997-10-11 Cement Squeeze 708.00 709.00 0
1997-10-16 Perforation 751.00 755.00 7
2010-03-10 Perforation 760.00 763.00 17
2010-03-11 Remedial Casing Cementing 760.00 763.00 0
2010-03-13 Perforation 750.00 755.00 17

For data sources see[4]



References