X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012413C00

Well Details

Well ID: 0404012413C00
Loading map...
Location: C0/13-24-040-01W4/0
Location Alias: C0/13-24-40-01 W4M
Location Alias 2: C0/13-24-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 24
County/Municipality: Municipal District of Provost No. 52
Well Name: NORCENINT ETAL 13C HAYTER 13-24-40-1
Operator Name: Harvest Operations Corp.
License Number: 0157021
License Date: 1993-03-05
License Status: Suspension
Spud Date: 1993-03-22
Final Drill Date: 1993-03-31
Well Total Depth: 1383.40 m
Surface Hole Latitude: 52.462665
Surface Hole Longitude: -110.017419

For data sources see[1][2]

Well History

Date Event
1993-03-05 Obtained License
1993-03-23 Surface Casing Operation Performed
1993-03-24 Direction Drilling Operation Performed - Horizontal
1993-03-27 Well Log Performed
1993-03-29 Intermediate Casing Operation Performed
1993-03-31 Finished Drilling
1993-03-31 Liner Casing Operation Performed
1993-03-31 Perforation Treatment Performed - Slotted Liner or Casing
1993-03-31 Well Log Performed
1993-03-31 Well Mode changed to Drilled and Cased
1993-04-01 Rig Released
1993-05-18 Well Log Performed
1993-06-01 Well Began Production
1993-06-01 Well Fluid changed to Crude Oil
1993-06-01 Well Mode changed to Pumping
2005-10-01 Well Fluid changed to Crude Oil
2005-10-01 Well Mode changed to Suspended
2011-08-16 Perforation Treatment Performed - Jet Perforation
2011-09-14 Well Fluid changed to Crude Oil
2011-09-14 Well Mode changed to Pumping
2018-08-02 Well Fluid changed to Crude Oil
2018-08-02 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1993-03-24 136.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1993-03-31 Slotted Liner 926.00 1383.40 0
2011-08-16 Perforation 870.00 880.00 7

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1993 2452 0.0 0.0 0.0
1994 7073 0.0 0.0 0.0
1995 8229 0.0 0.0 0.0
1996 8254 0.0 0.0 0.0
1997 7038 0.0 0.0 0.0
1998 5354 0.0 0.0 0.0
1999 7227 0.0 0.0 0.0
2000 7266 0.0 0.0 0.0
2001 4533 0.0 0.0 0.0
2002 24 0.0 0.0 0.0
2003 80 0.0 0.0 0.0
2004 631 0.0 0.0 0.0
2005 181 0.0 0.0 0.0
2011 2453 0.0 0.0 0.0
2012 5271 0.0 0.0 0.0
2013 4876 0.0 0.0 0.0
2014 8181 0.0 0.0 0.0
2015 8057 0.0 0.0 0.0
2016 913 0.0 0.0 0.0

For data sources see[6]

References