X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012013C00

Well Details

Well ID: 0404012013C00
Loading map...
Location: C0/13-20-040-01W4/0
Location Alias: C0/13-20-40-01 W4M
Location Alias 2: C0/13-20-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE HAYTER C 13-20-40-1
Operator Name: Harvest Operations Corp.
License Number: 0137875
License Date: 1988-12-28
License Status: Suspension
Spud Date: 1989-01-12
Final Drill Date: 1989-01-14
Well Total Depth: 820.00 m
Surface Hole Latitude: 52.462133
Surface Hole Longitude: -110.123260

For data sources see[1][2]

Well History

Date Event
1988-12-28 Obtained License
1989-01-13 Surface Casing Operation Performed
1989-01-14 Finished Drilling
1989-01-14 Well Mode changed to Drilled and Cased
1989-01-15 Well Log Performed
1989-01-16 Production Casing Operation Performed
1989-01-16 Rig Released
1989-02-09 Perforation Treatment Performed - Jet Perforation
1989-02-20 Well Began Production
1989-02-20 Well Fluid changed to Crude Oil
1989-02-20 Well Mode changed to Pumping
1993-09-30 Well Fluid changed to Crude Oil
1993-09-30 Well Mode changed to Suspended
1997-11-20 Well Fluid changed to Crude Oil
1997-11-20 Well Mode changed to Pumping
1999-10-04 Perforation Treatment Performed - Jet Perforation
1999-10-04 Well Log Performed
2005-09-01 Well Fluid changed to Crude Oil
2005-09-01 Well Mode changed to Suspended
2008-06-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2008-06-13 Plug Back Performed
2008-06-13 Well Fluid changed to Crude Oil
2008-06-13 Well Log Performed
2008-06-13 Well Mode changed to Abandoned Zone
2008-06-18 Perforation Treatment Performed - Jet Perforation
2008-06-18 Well Log Performed
2008-06-25 Perforation Treatment Performed - Fractured
2008-07-08 Well Log Performed
2008-11-04 Well Log Performed
2017-11-07 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2017-11-07 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1989-02-09 Perforation 753.50 755.00 13
2008-06-25 Fracture 715.20 717.00 0
2017-11-07 Packing Device Capped w/Cement 696.80 706.80 0
1989-02-09 Perforation 756.50 758.00 13
1989-02-09 Perforation 758.50 762.00 13
1999-10-04 Perforation 764.00 765.00 13
1999-10-04 Perforation 758.50 763.00 13
1999-10-04 Perforation 756.50 758.50 13
1999-10-04 Perforation 753.50 755.00 13
2008-06-13 Packing Device Capped w/Cement 740.00 748.00 0
2008-06-18 Perforation 715.20 717.00 17

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1989 7257 0.0 0.0 0.0
1990 6742 0.0 0.0 0.0
1991 8547 0.0 0.0 0.0
1992 8755 0.0 0.0 0.0
1993 240 0.0 0.0 0.0
1997 934 0.0 0.0 0.0
1998 8619 0.0 0.0 0.0
1999 8338 0.0 0.0 0.0
2000 8333 0.0 0.0 0.0
2001 8117 0.0 0.0 0.0
2002 8624 0.0 0.0 0.0
2003 4013 0.0 0.0 0.0
2004 216 0.0 0.0 0.0

For data sources see[5]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-11-07 No Incident Encountered 0.00 0.00

For data sources see[6]

References