X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0404012010030

Well Details

Well ID: 0404012010030
Loading map...
Location: 03/10-20-040-01W4/0
Location Alias: 03/10-20-40-01 W4M
Location Alias 2: 03/10-20-040-01 W4/00
Country: Canada
Province: Alberta
Township: 040
Meridian: 4
Range: 01
Section: 20
County/Municipality: Municipal District of Provost No. 52
Well Name: WESTCASTLE 103 HAYTER 10-20-40-1
Operator Name: Harvest Operations Corp.
License Number: 0228378
License Date: 1999-11-07
License Status: Suspension
Spud Date: 1999-11-16
Final Drill Date: 1999-11-18
Well Total Depth: 903.00 m
Surface Hole Latitude: 52.459309
Surface Hole Longitude: -110.111304

For data sources see[1][2]

Well History

Date Event
1999-11-07 Obtained License
1999-11-16 Direction Drilling Operation Performed - Deviate
1999-11-16 Surface Casing Operation Performed
1999-11-18 Finished Drilling
1999-11-18 Well Log Performed
1999-11-19 Production Casing Operation Performed
1999-11-19 Rig Released
1999-11-19 Well Log Performed
1999-11-19 Well Mode changed to Drilled and Cased
1999-12-11 Perforation Treatment Performed - Jet Perforation
1999-12-11 Well Log Performed
1999-12-28 Well Began Production
1999-12-28 Well Fluid changed to Crude Oil
1999-12-28 Well Mode changed to Pumping
2005-09-01 Well Fluid changed to Crude Oil
2005-09-01 Well Mode changed to Suspended
2010-09-29 Perforation Treatment Performed - Jet Perforation
2010-09-29 Well Log Performed
2010-10-01 Well Fluid changed to Crude Oil
2010-10-01 Well Mode changed to Pumping
2016-05-01 Well Fluid changed to Crude Oil
2016-05-01 Well Mode changed to Suspended

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
1999-11-16 137.00 Deviate (5 - 79 degrees)

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1999-12-11 Perforation 850.00 853.50 17
2010-09-29 Perforation 850.00 851.50 17
2010-09-29 Perforation 842.00 844.00 17

For data sources see[5]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1999 113 0.0 0.0 0.0
2000 8607 0.0 0.0 0.0
2001 8549 0.0 0.0 0.0
2002 5369 0.0 0.0 0.0
2010 1407 0.0 0.0 0.0
2011 6873 0.0 0.0 0.0
2012 5740 0.0 0.0 0.0
2013 8697 0.0 0.0 0.0
2014 2801 0.0 0.0 0.0

For data sources see[6]

References