X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395083401000

Well Details

Well ID: 0395083401000
Loading map...
Location: 00/01-34-039-08W5/0
Location Alias: 00/01-34-39-08 W5M
Location Alias 2: 00/01-34-039-08 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 34
County/Municipality: Clearwater County
Well Name: YANGARRA HZ FERRIER 1-34-39-8
Operator Name: Yangarra Resources Corp.
License Number: 0482532
License Date: 2017-01-23
License Status: Amended
Spud Date: 2017-02-03
Final Drill Date: 2017-02-17
Well Total Depth: 5504.00 m
Surface Hole Latitude: 52.425615
Surface Hole Longitude: -115.061720

For data sources see[1][2]

Well History

Date Event
2017-01-23 Obtained License
2017-02-06 Surface Casing Operation Performed
2017-02-09 Well Log Performed
2017-02-10 Direction Drilling Operation Performed - Deviate
2017-02-11 Direction Drilling Operation Performed - Horizontal
2017-02-17 Finished Drilling
2017-02-17 Well Log Performed
2017-02-17 Well Mode changed to Drilled and Cased
2017-02-24 Production Casing Operation Performed
2017-02-25 Rig Released
2017-02-28 Well Log Performed
2017-03-06 Well Log Performed
2017-03-23 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-24 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-25 Perforation Treatment Performed - Multi-Stage Fracture
2017-03-26 Perforation Treatment Performed - Multi-Stage Fracture
2017-04-06 Well Began Production
2017-04-06 Well Fluid changed to Crude Oil
2017-04-06 Well Mode changed to Flowing

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2017-02-10 1633.20 Deviate (5 - 79 degrees)
2017-02-11 2377.00 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2017-03-23 Multi-Stage Fracture 5484.20 5484.70 0
2017-03-24 Multi-Stage Fracture 5178.20 5178.30 0
2017-03-26 Multi-Stage Fracture 2605.90 2606.00 0
2017-03-26 Multi-Stage Fracture 2577.90 2578.00 0
2017-03-26 Multi-Stage Fracture 2549.80 2549.90 0
2017-03-26 Multi-Stage Fracture 2521.70 2521.80 0
2017-03-26 Multi-Stage Fracture 2494.00 2494.10 0
2017-03-26 Multi-Stage Fracture 2466.60 2466.70 0
2017-03-24 Multi-Stage Fracture 5150.70 5150.80 0
2017-03-24 Multi-Stage Fracture 5122.00 5122.10 0
2017-03-24 Multi-Stage Fracture 5092.90 5093.00 0
2017-03-24 Multi-Stage Fracture 5063.20 5063.30 0
2017-03-24 Multi-Stage Fracture 5033.80 5033.90 0
2017-03-24 Multi-Stage Fracture 5002.70 5002.80 0
2017-03-24 Multi-Stage Fracture 4972.30 4972.40 0
2017-03-24 Multi-Stage Fracture 4942.60 4942.70 0
2017-03-24 Multi-Stage Fracture 4912.90 4913.00 0
2017-03-24 Multi-Stage Fracture 5447.10 5447.20 0
2017-03-24 Multi-Stage Fracture 4883.30 4883.40 0
2017-03-24 Multi-Stage Fracture 4854.20 4854.30 0
2017-03-24 Multi-Stage Fracture 4824.40 4824.50 0
2017-03-24 Multi-Stage Fracture 4793.50 4793.60 0
2017-03-24 Multi-Stage Fracture 4762.40 4762.50 0
2017-03-24 Multi-Stage Fracture 4731.50 4731.60 0
2017-03-24 Multi-Stage Fracture 4700.40 4700.50 0
2017-03-24 Multi-Stage Fracture 4669.20 4669.30 0
2017-03-24 Multi-Stage Fracture 4638.20 4638.30 0
2017-03-24 Multi-Stage Fracture 4610.10 4610.20 0
2017-03-24 Multi-Stage Fracture 5407.70 5407.80 0
2017-03-24 Multi-Stage Fracture 4582.20 4582.30 0
2017-03-24 Multi-Stage Fracture 4554.30 4554.40 0
2017-03-24 Multi-Stage Fracture 4526.70 4526.80 0
2017-03-24 Multi-Stage Fracture 4498.50 4498.60 0
2017-03-24 Multi-Stage Fracture 4470.40 4470.50 0
2017-03-24 Multi-Stage Fracture 4442.40 4442.50 0
2017-03-24 Multi-Stage Fracture 4414.60 4414.70 0
2017-03-25 Multi-Stage Fracture 4386.50 4386.60 0
2017-03-25 Multi-Stage Fracture 4335.10 4335.20 0
2017-03-25 Multi-Stage Fracture 4307.10 4307.20 0
2017-03-24 Multi-Stage Fracture 5368.40 5368.50 0
2017-03-25 Multi-Stage Fracture 4278.90 4279.00 0
2017-03-25 Multi-Stage Fracture 4250.90 4251.00 0
2017-03-25 Multi-Stage Fracture 4223.10 4223.20 0
2017-03-25 Multi-Stage Fracture 4195.30 4195.40 0
2017-03-25 Multi-Stage Fracture 4167.20 4167.30 0
2017-03-25 Multi-Stage Fracture 4139.30 4139.40 0
2017-03-25 Multi-Stage Fracture 4111.10 4111.20 0
2017-03-25 Multi-Stage Fracture 4083.00 4083.10 0
2017-03-25 Multi-Stage Fracture 4055.20 4055.30 0
2017-03-25 Multi-Stage Fracture 4027.30 4027.40 0
2017-03-24 Multi-Stage Fracture 5328.80 5328.90 0
2017-03-25 Multi-Stage Fracture 3999.40 3999.50 0
2017-03-25 Multi-Stage Fracture 3971.80 3971.90 0
2017-03-25 Multi-Stage Fracture 3943.90 3944.00 0
2017-03-25 Multi-Stage Fracture 3916.40 3916.50 0
2017-03-25 Multi-Stage Fracture 3888.30 3888.40 0
2017-03-25 Multi-Stage Fracture 3860.30 3860.40 0
2017-03-25 Multi-Stage Fracture 3832.50 3832.60 0
2017-03-25 Multi-Stage Fracture 3804.40 3804.50 0
2017-03-25 Multi-Stage Fracture 3776.30 3776.40 0
2017-03-25 Multi-Stage Fracture 3748.60 3748.70 0
2017-03-24 Multi-Stage Fracture 5289.50 5289.60 0
2017-03-25 Multi-Stage Fracture 3720.70 3720.80 0
2017-03-25 Multi-Stage Fracture 3692.90 3693.00 0
2017-03-25 Multi-Stage Fracture 3665.40 3665.50 0
2017-03-25 Multi-Stage Fracture 3637.50 3637.60 0
2017-03-25 Multi-Stage Fracture 3609.50 3609.60 0
2017-03-25 Multi-Stage Fracture 3582.30 3582.40 0
2017-03-25 Multi-Stage Fracture 3554.30 3554.40 0
2017-03-25 Multi-Stage Fracture 3526.50 3526.60 0
2017-03-25 Multi-Stage Fracture 3498.80 3498.90 0
2017-03-25 Multi-Stage Fracture 3471.00 3471.10 0
2017-03-24 Multi-Stage Fracture 5261.60 5261.70 0
2017-03-25 Multi-Stage Fracture 3443.10 3443.20 0
2017-03-25 Multi-Stage Fracture 3415.20 3415.30 0
2017-03-25 Multi-Stage Fracture 3387.20 3387.30 0
2017-03-25 Multi-Stage Fracture 3359.50 3359.60 0
2017-03-25 Multi-Stage Fracture 3331.50 3331.60 0
2017-03-25 Multi-Stage Fracture 3303.70 3303.80 0
2017-03-25 Multi-Stage Fracture 3275.70 3275.80 0
2017-03-25 Multi-Stage Fracture 3247.50 3247.60 0
2017-03-25 Multi-Stage Fracture 3219.90 3220.00 0
2017-03-26 Multi-Stage Fracture 3191.80 3191.90 0
2017-03-24 Multi-Stage Fracture 5234.20 5234.30 0
2017-03-26 Multi-Stage Fracture 3163.90 3164.00 0
2017-03-26 Multi-Stage Fracture 3136.00 3136.10 0
2017-03-26 Multi-Stage Fracture 3108.10 3108.20 0
2017-03-26 Multi-Stage Fracture 3080.10 3080.20 0
2017-03-26 Multi-Stage Fracture 3052.50 3052.60 0
2017-03-26 Multi-Stage Fracture 3024.60 3024.70 0
2017-03-26 Multi-Stage Fracture 2996.50 2996.60 0
2017-03-26 Multi-Stage Fracture 2968.50 2968.60 0
2017-03-26 Multi-Stage Fracture 2940.40 2940.50 0
2017-03-26 Multi-Stage Fracture 2912.40 2912.50 0
2017-03-24 Multi-Stage Fracture 5206.20 5206.30 0
2017-03-26 Multi-Stage Fracture 2884.30 2884.40 0
2017-03-26 Multi-Stage Fracture 2856.90 2857.00 0
2017-03-26 Multi-Stage Fracture 2829.10 2829.20 0
2017-03-26 Multi-Stage Fracture 2801.20 2801.30 0
2017-03-26 Multi-Stage Fracture 2773.40 2773.50 0
2017-03-26 Multi-Stage Fracture 2745.40 2745.50 0
2017-03-26 Multi-Stage Fracture 2717.70 2717.80 0
2017-03-26 Multi-Stage Fracture 2689.70 2689.80 0
2017-03-26 Multi-Stage Fracture 2661.80 2661.90 0
2017-03-26 Multi-Stage Fracture 2633.70 2633.80 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2017-03-23 2017-03-26 2,165 8,760 N/A
2 2017-03-23 2017-03-23 2,165 0 N/A
3 2017-03-23 2017-03-24 2,165 0 N/A
4 2017-03-24 2017-03-26 2,165 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water Not Available 100 84.6379 N/A
Sand (20/40) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 11.6087 N/A
Crystalline silica. quartz 14808-60-7 100 11.6087 N/A
Iron Oxide 1309-37-1 100 11.6087 N/A
Titanium Oxide 13463-67-7 100 11.6086 N/A
Sand (30/50) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 3.5213 N/A
Crystalline silica. quartz 14808-60-7 100 3.5213 N/A
Iron Oxide 1309-37-1 100 3.5213 N/A
Titanium Oxide 13463-67-7 100 3.5213 N/A
Chemcide PT Canyon Technical Services Bactericide/Biocide Methyl Alcohol 67-56-1 100 0.0207 N/A
N-Coco Alkyltrimethylenediamine diacetates 61791-64-8 100 0.0207 N/A
CAN-1911 Clay Stabilizer Canyon Technical Services Clay Control 1.6-Hexandiamine. dihydrochloride 6055-52-3 100 0.0569 N/A
Water 7732-18-5 100 0.0569 N/A
CAN-2413 Non-emulsifier Canyon Technical Services Demulsifier Isopropyl Alcohol 67-63-0 100 0.0633 N/A
Methanol 67-56-1 100 0.0633 N/A
Non-hazardous base ingredient(s) Not Available 100 0.0633 N/A
Sulfonic Acids (Petroleum) 61789-85-3 100 0.0633 N/A
CAN-2056 Gellant (G50 Microtox EC50) Canyon Technical Services Gelling Agent Ammonium Chloride 12125-02-9 100 0.0844 N/A
Hydrotreated Kerosene 64742-47-8 100 0.0844 N/A
Water 7732-18-5 100 0.0844 N/A
2 Sand (40/70) Ottawa Canyon Technical Services Aluminum Oxide 1344-28-1 100 0.1996 N/A
Crystalline silica. quartz 14808-60-7 100 0.1996 N/A
Iron Oxide 1309-37-1 100 0.1997 N/A
Titanium Oxide 13463-67-7 100 0.2 N/A
3 CAN-4005 Tubular Lubricant Canyon Technical Services Friction Reducer Fatty Acids. Tall Oil. Sulfurized Methyl Esters 68440-27-7 100 0.0017 N/A
Sweetened Middle Distillate 64742-47-8 100 0.0017 N/A
Water 7732-18-5 100 0.0017 N/A
4 CAN-2057 Friction Reducer Canyon Technical Services Gelling Agent No hazardous ingredients Not Available 100 0.0041 N/A

For data sources see[6]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2017-03-23 2017-03-26 Surface Water - River 8427

For data sources see[7]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2017 6239 0.0 0.0 0.0
2018 8225 0.0 0.0 0.0
2019 5924 0.0 0.0 0.0
2020 2047 0.0 0.0 0.0

For data sources see[8]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2017-02-25 No Incident Encountered 0.00 0.00
2017-03-30 No Incident Encountered 0.00 0.00

For data sources see[9]

References