X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395081007002

Well Details

Well ID: 0395081007002
Loading map...
Location: 00/07-10-039-08W5/2
Location Alias: 00/07-10-39-08 W5M
Location Alias 2: 00/07-10-039-08 W5/02
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 10
County/Municipality: Clearwater County
Well Name: KRANG FERR 7-10-39-8
Operator Name: Harvest Operations Corp.
License Number: 0079036
License Date: 1979-11-02
License Status: Amended
Spud Date: 1979-11-09
Final Drill Date: 1979-12-24
Well Total Depth: 2897.50 m
Surface Hole Latitude: 52.338356
Surface Hole Longitude: -115.063515

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-11-02 Obtained License
1979-12-08 Drill Stem Test Performed
1979-12-24 Finished Drilling
1979-12-24 Well Log Performed
1979-12-24 Well Mode changed to Drilled and Cased
1979-12-26 Production Casing Operation Performed
1980-07-14 Perforation Treatment Performed - Jet Perforation
1980-07-16 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-17 Perforation Treatment Performed - Jet Perforation
1980-07-18 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-21 Perforation Treatment Performed - Cement Squeeze
1980-07-23 Perforation Treatment Performed - Jet Perforation
1980-07-24 Perforation Treatment Performed - Acid Squeeze - Press Used
1994-05-10 Perforation Treatment Performed - Jet Perforation
1994-05-11 Perforation Treatment Performed - Jet Perforation
1994-05-11 Well Log Performed
1994-05-13 Well Log Performed
1994-05-14 Well Log Performed
1994-05-15 Perforation Treatment Performed - Jet Perforation
1994-05-15 Perforation Treatment Performed - Remedial Casing
1994-05-21 Perforation Treatment Performed - Remedial Casing
1994-05-29 Perforation Treatment Performed - Fractured
2001-02-02 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2001-02-02 Plug Back Performed
2001-02-06 Perforation Treatment Performed - Jet Perforation
2001-02-08 Perforation Treatment Performed - Remedial Casing
2001-02-09 Perforation Treatment Performed - Jet Perforation
2001-02-09 Perforation Treatment Performed - Remedial Casing
2001-02-11 Perforation Treatment Performed - Jet Perforation
2001-02-11 Perforation Treatment Performed - Remedial Casing
2001-02-12 Perforation Treatment Performed - Jet Perforation
2001-02-12 Well Mode changed to Drilled and Cased
2003-02-25 Perforation Treatment Performed - Bridge Plug Capped W/Cement
2003-02-25 Perforation Treatment Performed - Jet Perforation
2003-02-25 Plug Back Performed
2003-02-25 Well Mode changed to Abandoned Zone
2003-02-26 Perforation Treatment Performed - Remedial Casing
2003-02-27 Perforation Treatment Performed - Jet Perforation
2003-02-28 Perforation Treatment Performed - Remedial Casing
2003-03-01 Perforation Treatment Performed - Jet Perforation
2003-03-02 Perforation Treatment Performed - Remedial Casing
2003-06-18 Well Abandoned
2003-06-18 Well Mode changed to Abandoned and Re-entered
2005-07-11 Perforation Treatment Performed - Jet Perforation
2005-07-15 Well Log Performed
2005-07-30 Perforation Treatment Performed - Cement Squeeze
2005-07-30 Plug Back Performed

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-07-14 Perforation 2776.00 2778.00 7
1994-05-10 Perforation 2223.00 2227.00 14
1994-05-11 Perforation 742.00 743.00 14
1994-05-15 Perforation 487.00 487.50 8
1994-05-15 Remedial Casing Cementing 487.00 487.50 0
1994-05-21 Remedial Casing Cementing 742.00 743.00 0
1994-05-29 Fracture 2223.00 2227.00 0
2001-02-02 Packing Device Capped w/Cement 2200.00 2208.00 0
2001-02-06 Perforation 1529.00 1530.00 17
2001-02-08 Remedial Casing Cementing 1529.00 1530.00 0
2001-02-09 Perforation 960.00 961.00 14
1980-07-14 Perforation 2783.00 2786.00 7
2001-02-09 Remedial Casing Cementing 960.00 961.00 0
2001-02-11 Perforation 610.00 611.00 14
2001-02-11 Remedial Casing Cementing 610.00 611.00 0
2001-02-12 Perforation 574.00 575.00 14
2003-02-25 Packing Device Capped w/Cement 554.00 562.00 0
2003-02-25 Perforation 445.00 446.00 14
2003-02-26 Remedial Casing Cementing 445.00 446.00 0
2003-02-27 Perforation 390.00 391.00 14
2003-02-28 Remedial Casing Cementing 390.00 391.00 0
2003-03-01 Perforation 314.00 315.00 17
1980-07-14 Perforation 2787.50 2788.50 7
2003-03-02 Remedial Casing Cementing 314.00 315.00 0
2005-07-11 Perforation 574.00 575.00 14
2005-07-30 Cement Squeeze 574.00 575.00 0
1980-07-16 Acid Treatment 2776.00 2788.50 0
1980-07-17 Perforation 2756.00 2760.00 7
1980-07-18 Acid Treatment 2756.00 2760.00 0
1980-07-21 Cement Squeeze 2756.00 2788.50 0
1980-07-23 Perforation 2223.00 2227.00 7
1980-07-24 Acid Treatment 2223.00 2227.00 0

For data sources see[4]



References