X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395080710000

Well Details

Well ID: 0395080710000
Loading map...
Location: 00/10-07-039-08W5/0
Location Alias: 00/10-07-39-08 W5M
Location Alias 2: 00/10-07-039-08 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 08
Section: 07
County/Municipality: Clearwater County
Well Name: ESSO FERRIER 10-7-39-8
Operator Name: Imperial Oil Resources Limited
License Number: 0075447
License Date: 1979-05-03
License Status: RecCertified
Spud Date: 1979-05-17
Final Drill Date: 1979-06-09
Well Total Depth: 2664.00 m
Surface Hole Latitude: 52.343574
Surface Hole Longitude: -115.135180

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1979-05-03 Obtained License
1979-06-09 Finished Drilling
1979-06-14 Production Casing Operation Performed
1979-06-25 Perforation Treatment Performed - Jet Perforation
1979-06-27 Drill Stem Test Performed
1979-07-05 Perforation Treatment Performed - Cement Squeeze
1979-07-10 Perforation Treatment Performed - Jet Perforation
1979-07-12 Drill Stem Test Performed
1979-07-16 Drill Stem Test Performed
1979-07-30 Perforation Treatment Performed - Fractured
1979-11-01 Well Mode changed to Drilled and Cased
1985-01-01 Well Began Production
1985-01-01 Well Fluid changed to Crude Oil
1985-01-01 Well Mode changed to Flowing
1985-01-22 Well Fluid changed to Crude Oil
1985-01-22 Well Mode changed to Suspended
1993-09-01 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1993-09-01 Perforation Treatment Performed - Jet Perforation
1993-09-01 Plug Back Performed
1993-09-01 Well Log Performed
1993-09-02 Perforation Treatment Performed - Remedial Casing
1993-09-02 Well Fluid changed to Crude Oil
1993-09-02 Well Mode changed to Abandoned and Re-entered
1993-09-13 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1979-06-25 Perforation 2287.00 2293.00 7
1979-07-05 Cement Squeeze 2287.00 2293.00 0
1979-07-10 Perforation 2287.00 2293.00 7
1979-07-30 Fracture 2287.00 2293.00 0
1993-09-01 Packing Device Capped w/Cement 2256.00 2264.00 0
1993-09-01 Perforation 600.00 600.50 13
1993-09-02 Remedial Casing Cementing 600.00 600.50 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1985 316 0.0 0.0 0.0

For data sources see[5]

References