X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395063602000

Well Details

Well ID: 0395063602000
Loading map...
Location: 00/02-36-039-06W5/0
Location Alias: 00/02-36-39-06 W5M
Location Alias 2: 00/02-36-039-06 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 06
Section: 36
County/Municipality: Clearwater County
Well Name: BONTERRA HZ WILLGR 2-36-39-6
Operator Name: Bonterra Energy Corp.
License Number: 0496799
License Date: 2019-12-06
License Status: Amended
Spud Date: 2020-01-13
Final Drill Date: 2020-01-18
Well Total Depth: 3467.00 m
Surface Hole Latitude: 52.408376
Surface Hole Longitude: -114.729582

For data sources see[1][2]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2020-01-13 Ironhand Drilling Inc. 1 Drill To LD

For data sources see[3]

Directional Drilling

Start Date Depth (m) Reason
2020-01-16 1574.50 Deviate (5 - 79 degrees)
2020-01-17 2035.40 Horizontal

For data sources see[4]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2020-01-31 Multi-Stage Fracture 3434.70 3436.60 0
2020-01-31 Multi-Stage Fracture 3144.00 3145.90 0
2020-01-31 Multi-Stage Fracture 3111.30 3113.30 0
2020-01-31 Multi-Stage Fracture 3079.10 3081.10 0
2020-01-31 Multi-Stage Fracture 3047.50 3049.40 0
2020-02-01 Multi-Stage Fracture 3015.80 3017.70 0
2020-02-01 Multi-Stage Fracture 2984.20 2986.10 0
2020-02-01 Multi-Stage Fracture 2952.80 2954.70 0
2020-02-01 Multi-Stage Fracture 2920.70 2922.60 0
2020-02-01 Multi-Stage Fracture 2890.10 2892.00 0
2020-02-01 Multi-Stage Fracture 2856.80 2858.70 0
2020-01-31 Multi-Stage Fracture 3401.90 3403.80 0
2020-02-01 Multi-Stage Fracture 2824.80 2826.70 0
2020-02-01 Multi-Stage Fracture 2792.60 2794.60 0
2020-02-01 Multi-Stage Fracture 2760.10 2762.00 0
2020-02-01 Multi-Stage Fracture 2727.70 2729.60 0
2020-02-01 Multi-Stage Fracture 2697.20 2699.10 0
2020-02-01 Multi-Stage Fracture 2665.00 2666.90 0
2020-02-01 Multi-Stage Fracture 2633.90 2635.80 0
2020-02-01 Multi-Stage Fracture 2601.00 2603.00 0
2020-02-01 Multi-Stage Fracture 2570.50 2572.40 0
2020-02-01 Multi-Stage Fracture 2539.40 2541.30 0
2020-01-31 Multi-Stage Fracture 3370.40 3372.30 0
2020-02-01 Multi-Stage Fracture 2508.30 2510.20 0
2020-02-01 Multi-Stage Fracture 2477.20 2479.10 0
2020-02-01 Multi-Stage Fracture 2446.20 2448.10 0
2020-02-01 Multi-Stage Fracture 2414.20 2416.10 0
2020-02-01 Multi-Stage Fracture 2381.50 2383.40 0
2020-02-01 Multi-Stage Fracture 2350.10 2352.00 0
2020-02-01 Multi-Stage Fracture 2319.30 2321.20 0
2020-02-01 Multi-Stage Fracture 2287.10 2289.00 0
2020-02-01 Multi-Stage Fracture 2255.90 2257.80 0
2020-02-02 Multi-Stage Fracture 2223.30 2225.30 0
2020-01-31 Multi-Stage Fracture 3338.10 3340.00 0
2020-02-02 Multi-Stage Fracture 2191.30 2193.20 0
2020-02-02 Multi-Stage Fracture 2159.90 2161.80 0
2020-02-02 Multi-Stage Fracture 2130.70 2132.60 0
2020-02-02 Multi-Stage Fracture 2099.80 2101.70 0
2020-02-02 Multi-Stage Fracture 2070.50 2072.40 0
2020-01-31 Multi-Stage Fracture 3305.70 3307.60 0
2020-01-31 Multi-Stage Fracture 3273.00 3274.90 0
2020-01-31 Multi-Stage Fracture 3240.60 3242.50 0
2020-01-31 Multi-Stage Fracture 3207.70 3209.60 0
2020-01-31 Multi-Stage Fracture 3175.20 3177.10 0

For data sources see[5]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2020-01-31 2020-02-02 1,883 6,090 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Hydrochloric Acid 7647-01-0 100 0.479 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.4771 N/A
Water 7732-18-5 100 95.0583 N/A
20/40 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 3.9588 N/A
30/50 Mesh Element Crystalline Silica (Quartz) 14808-60-7 100 1.2818 N/A
ELECIDE - 2L Element Bactericide/Biocide 2-Dibromo. 3-Nitrilopropionamide 10222-01-2 100 0.0088 N/A
Non hazardous ingredients (WHMIS criteria) Not Available 100 0.0088 N/A
ELEHV-3 Element Friction Reducer Hydrotreated light paraffinic distillate 64742-55-8 100 0.0741 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0741 N/A
ELEFE-4 IFTR Element Surfactant Alkylbenzenesulfonic acid Trade Secret 100 0.0865 N/A
Ethylene Glycol 107-21-1 100 0.0865 N/A
Isopropanol 67-63-0 100 0.0865 N/A
Non-hazardous ingredients (WHMIS criteria) Not Available 100 0.0865 N/A

For data sources see[6]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2020 1263 0.0 0.0 0.0

For data sources see[7]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2020-01-20 No Incident Encountered 0.00 0.00
2020-02-02 No Incident Encountered 0.00 0.00

For data sources see[8]

References