X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395062706023

Well Details

Well ID: 0395062706023
Loading map...
Location: 02/06-27-039-06W5/3
Location Alias: 02/06-27-39-06 W5M
Location Alias 2: 02/06-27-039-06 W5/03
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 06
Section: 27
County/Municipality: Clearwater County
Well Name: HARVEST WILLGR 6-27-39-6
Operator Name: Harvest Operations Corp.
License Number: 0081435
License Date: 1980-02-29
License Status: Issued
Spud Date: 1980-02-18
Final Drill Date: 1980-03-16
Well Total Depth: 2555.00 m
Surface Hole Latitude: 52.383048
Surface Hole Longitude: -114.784397

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1980-02-29 Obtained License
1980-03-16 Finished Drilling
1980-03-16 Well Mode changed to Drilled and Cased
1980-03-23 Production Casing Operation Performed
1980-06-18 Perforation Treatment Performed - Jet Perforation
1980-07-04 Perforation Treatment Performed - Acid Squeeze - Press Used
1980-07-24 Perforation Treatment Performed - Fractured
1980-12-16 Perforation Treatment Performed - Fractured
1981-03-04 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1981-03-04 Perforation Treatment Performed - Jet Perforation
1981-03-04 Plug Back Performed
1981-03-05 Perforation Treatment Performed - Fractured
2004-06-06 Well Log Performed
2004-06-08 Perforation Treatment Performed - Cement Squeeze
2004-06-08 Plug Back Performed
2004-06-11 Perforation Treatment Performed - Jet Perforation
2004-06-13 Perforation Treatment Performed - Jet Perforation
2004-06-13 Well Log Performed
2004-06-16 Perforation Treatment Performed - Fractured
2004-07-01 Well Began Production
2004-07-01 Well Fluid changed to Gas
2004-07-01 Well Mode changed to Flowing
2008-01-01 Well Fluid changed to Gas
2008-01-01 Well Mode changed to Pumping

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1980-06-18 Perforation 2477.00 2478.00 13
1981-03-04 Perforation 2424.50 2426.00 13
1981-03-04 Packing Device Capped w/Cement 2452.00 2460.00 0
1981-03-05 Fracture 2416.50 2426.00 0
2004-06-08 Cement Squeeze 2416.50 2426.00 0
2004-06-11 Perforation 2477.00 2478.00 13
2004-06-11 Perforation 2479.50 2482.00 13
2004-06-11 Perforation 2486.00 2487.50 13
2004-06-11 Perforation 2489.00 2491.50 13
2004-06-11 Perforation 2493.00 2494.00 13
2004-06-13 Perforation 2451.00 2453.00 17
1980-06-18 Perforation 2479.50 2482.00 13
2004-06-16 Fracture 2451.00 2453.00 0
1980-06-18 Perforation 2486.00 2487.50 13
1980-06-18 Perforation 2489.00 2491.50 13
1980-06-18 Perforation 2493.00 2494.00 13
1980-07-04 Acid Treatment 2477.00 2494.00 0
1980-07-24 Fracture 2477.00 2494.00 0
1980-12-16 Fracture 2477.00 2494.00 0
1981-03-04 Perforation 2416.50 2423.00 13

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2004 2941 0.0 0.0 0.0
2005 8386 0.0 0.0 0.0
2006 8735 0.0 0.0 0.0
2007 8647 0.0 0.0 0.0
2008 8687 0.0 0.0 0.0
2009 8544 0.0 0.0 0.0
2010 8567 0.0 0.0 0.0
2011 8552 0.0 0.0 0.0
2012 8735 0.0 0.0 0.0
2013 8106 0.0 0.0 0.0
2014 8399 0.0 0.0 0.0
2015 7177 0.0 0.0 0.0
2016 8711 0.0 0.0 0.0
2017 8759 0.0 0.0 0.0
2018 8663 0.0 0.0 0.0
2019 8101 0.0 0.0 0.0
2020 2183 0.0 0.0 0.0

For data sources see[5]

References