X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395061015000

Well Details

Well ID: 0395061015000
Loading map...
Location: 00/15-10-039-06W5/0
Location Alias: 00/15-10-39-06 W5M
Location Alias 2: 00/15-10-039-06 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 06
Section: 10
County/Municipality: Clearwater County
Well Name: ROGCI HZ WILLGR 15-10-39-6
Operator Name: Repsol Oil & Gas Canada Inc.
License Number: 0490612
License Date: 2018-08-27
License Status: Issued
Spud Date: 2018-11-16
Final Drill Date: 2018-12-11
Well Total Depth: 6121.00 m
Surface Hole Latitude: 52.325247
Surface Hole Longitude: -114.755397

For data sources see[1][2]

Well History

Date Event
2018-08-27 Obtained License
2018-11-17 Surface Casing Operation Performed
2018-11-19 Direction Drilling Operation Performed - Deviate
2018-11-28 Intermediate Casing Operation Performed
2018-12-04 Direction Drilling Operation Performed - Horizontal
2018-12-05 Well Log Performed
2018-12-11 Finished Drilling
2018-12-11 Well Log Performed
2018-12-11 Well Mode changed to Drilled and Cased
2018-12-12 Well Log Performed
2018-12-15 Well Log Performed
2018-12-17 Production Casing Operation Performed
2018-12-20 Rig Released
2019-06-14 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-15 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-16 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-17 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-18 Perforation Treatment Performed - Multi-Stage Fracture
2019-06-19 Perforation Treatment Performed - Multi-Stage Fracture
2019-07-06 Well Fluid changed to Shale Gas Only
2019-07-06 Well Mode changed to Testing
2019-08-28 Well Began Production
2019-08-28 Well Fluid changed to Shale Gas Only
2019-08-28 Well Mode changed to Flowing

For data sources see[3]

Spud Table

Spud Date Contractor Rig Number New Projected Depth (m) Activity Type
2018-11-16 Precision Drilling Corporation 571 N/A Drill To LD

For data sources see[4]

Directional Drilling

Start Date Depth (m) Reason
2018-11-19 769.50 Deviate (5 - 79 degrees)
2018-12-04 3568.00 Horizontal

For data sources see[5]

Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
2019-06-14 Multi-Stage Fracture 6050.70 6050.80 0
2019-06-15 Multi-Stage Fracture 5471.30 5471.40 0
2019-06-15 Multi-Stage Fracture 5412.50 5412.60 0
2019-06-16 Multi-Stage Fracture 5353.50 5353.60 0
2019-06-16 Multi-Stage Fracture 5294.10 5294.20 0
2019-06-16 Multi-Stage Fracture 5235.20 5235.30 0
2019-06-16 Multi-Stage Fracture 5175.50 5175.60 0
2019-06-16 Multi-Stage Fracture 5116.00 5116.10 0
2019-06-16 Multi-Stage Fracture 5057.50 5057.60 0
2019-06-16 Multi-Stage Fracture 4997.60 4997.70 0
2019-06-16 Multi-Stage Fracture 4937.90 4938.00 0
2019-06-14 Multi-Stage Fracture 5988.70 5988.80 0
2019-06-16 Multi-Stage Fracture 4878.70 4878.80 0
2019-06-16 Multi-Stage Fracture 4819.20 4819.30 0
2019-06-17 Multi-Stage Fracture 4760.10 4760.20 0
2019-06-17 Multi-Stage Fracture 4704.00 4704.10 0
2019-06-17 Multi-Stage Fracture 4645.40 4645.50 0
2019-06-17 Multi-Stage Fracture 4587.10 4587.20 0
2019-06-17 Multi-Stage Fracture 4528.20 4528.30 0
2019-06-17 Multi-Stage Fracture 4468.30 4468.40 0
2019-06-17 Multi-Stage Fracture 4409.70 4409.80 0
2019-06-17 Multi-Stage Fracture 4351.10 4351.20 0
2019-06-14 Multi-Stage Fracture 5929.20 5929.30 0
2019-06-18 Multi-Stage Fracture 4291.10 4291.20 0
2019-06-18 Multi-Stage Fracture 4232.50 4232.60 0
2019-06-18 Multi-Stage Fracture 4173.00 4173.10 0
2019-06-18 Multi-Stage Fracture 4112.90 4113.00 0
2019-06-18 Multi-Stage Fracture 4053.30 4053.40 0
2019-06-18 Multi-Stage Fracture 4008.50 4008.60 0
2019-06-18 Multi-Stage Fracture 3963.20 3963.30 0
2019-06-18 Multi-Stage Fracture 3917.70 3917.80 0
2019-06-19 Multi-Stage Fracture 3873.00 3873.10 0
2019-06-19 Multi-Stage Fracture 3828.40 3828.50 0
2019-06-14 Multi-Stage Fracture 5869.20 5869.30 0
2019-06-19 Multi-Stage Fracture 3783.00 3783.10 0
2019-06-19 Multi-Stage Fracture 3737.30 3737.40 0
2019-06-14 Multi-Stage Fracture 5811.70 5811.80 0
2019-06-15 Multi-Stage Fracture 5695.80 5695.90 0
2019-06-15 Multi-Stage Fracture 5636.80 5636.90 0
2019-06-15 Multi-Stage Fracture 5582.90 5583.00 0
2019-06-15 Multi-Stage Fracture 5528.30 5528.40 0

For data sources see[6]

Fracking Activities

Fracking Jobs

Job Number Job Start Date Job End Date True Vertical Depth (ft) Total Water Volume (gal) Total Non-Water Volume (gal)
1 2019-06-14 2019-06-19 3,369 0 N/A
2 2019-06-14 2019-06-17 3,369 0 N/A

Fluid Composition Data

Job Number Trade Name Supplier Purpose Ingredient Name CAS Number Additive Percentage by Mass Job Percentage by Mass Mass Used (lb)
1 Water (Including Mix Water Supplied by Client)* 7732-18-5 100 86.5995 N/A
Slickwater/HVFR Schlumberger Quartz. Crystalline silica 14808-60-7 100 6.6445 N/A
Slickwater/HVFR Schlumberger Energizing Fluid Acetic acid 64-19-7 100 0.0006 N/A
Acrylic polymer Trade Secret 100 0.0401 N/A
Amines. dicoco alkylmethyl 61788-62-3 100 0 N/A
Diammonium peroxodisulphate 7727-54-0 100 0.0024 N/A
Dicoco dimethyl quaternary ammonium chloride 61789-77-3 100 0.0004 N/A
Ethylene glycol 107-21-1 100 0.0033 N/A
Hydrocarbon Trade Secret 100 0.0286 N/A
Magnesium silicate hydrate (talc) 14807-96-6 100 0 N/A
Methanol 67-56-1 100 0.0029 N/A
N-Coco. 1.3-diaminopropane di-acetate 61791-64-8 100 0.0015 N/A
Non-ionic surfactant Trade Secret 100 0.0028 N/A
poly(tetrafluoroethylene) 9002-84-0 100 0 N/A
Polyethylene glycol monohexyl ether 31726-34-8 100 0.0057 N/A
Propan-2-ol 67-63-0 100 0 N/A
Secondary alcohols. ethoxylated Trade Secret 100 0.0028 N/A
Sodium salt of Polymaleic Acid Copolymer 111560-38-4 100 0.0009 N/A
Vinylidene chloride/methylacrylate copolymer 25038-72-6 100 0.0005 N/A
2 Slickwater/HVFR Schlumberger Energizing Fluid Acrylamide/Sodiumacrylate copolymer 25085-02-3 100 0.0456 N/A
Methyl-oxirane polymer with oxirane 11/6/9003 100 0.0007 N/A
Sodium chloride 7647-14-5 100 0.0024 N/A

For data sources see[7]

Water Sources

Water Diversion Start Date Water Diversion End Date Water Source Type Total Water Volume (m3)
2019-06-12 2019-06-20 Central Water Distribution Facility 37296

For data sources see[8]

Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
2019 2994 0.0 0.0 0.0
2020 2158 0.0 0.0 0.0

For data sources see[9]

Occurences

Occurence Date Occurence Type Occurence Depth (m) Occurence Control Depth (m)
2018-12-20 No Incident Encountered 0.00 0.00
2019-07-18 No Incident Encountered 0.00 0.00

For data sources see[10]

References