If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395040612003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.329681,"lon":-114.574689,"icon":""}]} |
Location: 00/12-06-039-04W5/3 | |
Location Alias: 00/12-06-39-04 W5M | |
Location Alias 2: 00/12-06-039-04 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Clearwater County | |
Well Name: PARA MEDRIV 12-6-39-4 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0074580 | |
License Date: 1979-02-20 | |
License Status: Issued | |
Spud Date: 1979-03-10 | |
Final Drill Date: 1979-04-03 | |
Well Total Depth: 2385.00 m | |
Surface Hole Latitude: 52.329681 | |
Surface Hole Longitude: -114.574689 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1979-02-20 | Obtained License |
1979-04-03 | Finished Drilling |
1979-04-03 | Well Mode changed to Drilled and Cased |
1979-04-06 | Drill Stem Test Performed |
1979-04-07 | Production Casing Operation Performed |
1979-06-28 | Perforation Treatment Performed - Jet Perforation |
1979-06-29 | Perforation Treatment Performed - Fractured |
1979-06-29 | Well Log Performed |
2006-10-10 | Perforation Treatment Performed - Jet Perforation |
2006-10-10 | Well Log Performed |
2006-10-12 | Perforation Treatment Performed - Jet Perforation |
2006-10-13 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-10-14 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-14 | Plug Back Performed |
2006-10-15 | Perforation Treatment Performed - Jet Perforation |
2006-10-16 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-10-17 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-17 | Plug Back Performed |
2006-10-18 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-10-18 | Plug Back Performed |
2006-10-18 | Well Log Performed |
2006-10-19 | Well Log Performed |
2006-10-20 | Perforation Treatment Performed - Jet Perforation |
2006-10-24 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-10-30 | Perforation Treatment Performed - Fractured |
2006-11-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
2006-11-01 | Plug Back Performed |
2006-11-01 | Well Log Performed |
2006-11-02 | Perforation Treatment Performed - Jet Perforation |
2006-11-02 | Well Log Performed |
2006-11-03 | Perforation Treatment Performed - Acid Squeeze - Press Used |
2006-11-30 | Perforation Treatment Performed - Fractured |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1979-06-28 | Perforation | 2267.00 | 2269.50 | 7 |
2006-10-17 | Packing Device Capped w/Cement | 2289.00 | 2297.00 | 0 |
2006-10-18 | Packing Device Capped w/Cement | 2259.00 | 2267.00 | 0 |
2006-10-20 | Perforation | 2096.50 | 2109.00 | 17 |
2006-10-24 | Acid Treatment | 2096.50 | 2109.00 | 0 |
2006-10-30 | Fracture | 2096.50 | 2109.00 | 0 |
2006-11-01 | Packing Device Capped w/Cement | 2092.00 | 2100.00 | 0 |
2006-11-02 | Perforation | 1802.00 | 1805.00 | 17 |
2006-11-03 | Acid Treatment | 1802.00 | 1805.00 | 0 |
2006-11-30 | Fracture | 1802.00 | 1805.00 | 0 |
1979-06-28 | Perforation | 2271.00 | 2273.00 | 7 |
1979-06-29 | Fracture | 2267.00 | 2273.00 | 0 |
2006-10-10 | Perforation | 2315.00 | 2317.00 | 17 |
2006-10-12 | Perforation | 2318.00 | 2320.00 | 17 |
2006-10-13 | Acid Treatment | 2315.00 | 2320.00 | 0 |
2006-10-14 | Packing Device Capped w/Cement | 2312.00 | 2320.00 | 0 |
2006-10-15 | Perforation | 2292.00 | 2301.00 | 17 |
2006-10-16 | Acid Treatment | 2292.00 | 2301.00 | 0 |
For data sources see[4]
Occurence Date | Occurence Type | Occurence Depth (m) | Occurence Control Depth (m) |
---|---|---|---|
2013-03-23 | No Incident Encountered | 0.00 | 0.00 |
For data sources see[5]