If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.
powered by ChangeDetection
Well ID: 0395040605003 | Loading map...
{"type":"SATELLITE","minzoom":false,"maxzoom":false,"types":["ROADMAP","SATELLITE","HYBRID","TERRAIN"],"mappingservice":"googlemaps3","width":"100%","height":"350px","centre":false,"title":"","label":"","icon":"","visitedicon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"wmsoverlay":false,"copycoords":false,"static":false,"zoom":14,"layers":[],"controls":["pan","zoom","type","scale","streetview","rotate"],"zoomstyle":"DEFAULT","typestyle":"DEFAULT","autoinfowindows":false,"resizable":false,"kmlrezoom":false,"poi":true,"markercluster":false,"clustergridsize":60,"clustermaxzoom":20,"clusterzoomonclick":true,"clusteraveragecenter":true,"clusterminsize":2,"imageoverlays":[],"kml":[],"gkml":[],"searchmarkers":"","enablefullscreen":false,"scrollwheelzoom":false,"locations":[{"text":"","title":"","link":"","lat":52.323299,"lon":-114.573866,"icon":""}]} |
Location: 00/05-06-039-04W5/3 | |
Location Alias: 00/05-06-39-04 W5M | |
Location Alias 2: 00/05-06-039-04 W5/03 | |
Country: Canada | |
Province: Alberta | |
Township: 039 | |
Meridian: 5 | |
Range: 04 | |
Section: 06 | |
County/Municipality: Clearwater County | |
Well Name: PARA ET AL MEDRIV 5-6-39-4 | |
Operator Name: Paramount Resources Ltd. | |
License Number: 0096309 | |
License Date: 1982-06-15 | |
License Status: Suspension | |
Spud Date: 1982-08-19 | |
Final Drill Date: 1982-09-06 | |
Well Total Depth: 2445.00 m | |
Surface Hole Latitude: 52.323299 | |
Surface Hole Longitude: -114.573866 |
Date | Event |
---|---|
1909-09-09 | Well Log Performed |
1982-06-15 | Obtained License |
1982-09-06 | Finished Drilling |
1982-09-06 | Well Mode changed to Drilled and Cased |
1982-09-08 | Well Log Performed |
1982-09-09 | Drill Stem Test Performed |
1982-09-11 | Drill Stem Test Performed |
1982-09-12 | Production Casing Operation Performed |
1982-11-03 | Perforation Treatment Performed - Jet Perforation |
1982-11-04 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-06 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-11-07 | Perforation Treatment Performed - Acid Squeeze - Press Used |
1982-11-07 | Perforation Treatment Performed - Jet Perforation |
1982-11-10 | Perforation Treatment Performed - Cement Squeeze |
1982-11-11 | Perforation Treatment Performed - Jet Perforation |
1982-12-01 | Perforation Treatment Performed - Bridge Plug Capped W/Cement |
1982-12-02 | Perforation Treatment Performed - Jet Perforation |
1982-12-04 | Perforation Treatment Performed - Fractured |
1986-07-10 | Well Log Performed |
1986-07-11 | Perforation Treatment Performed - Jet Perforation |
1986-07-13 | Perforation Treatment Performed - Cement Squeeze |
1986-07-13 | Plug Back Performed |
1986-07-16 | Well Log Performed |
1986-07-17 | Perforation Treatment Performed - Jet Perforation |
2006-08-16 | Perforation Treatment Performed - Jet Perforation |
2006-08-20 | Perforation Treatment Performed - Fractured |
2006-08-29 | Perforation Treatment Performed - Jet Perforation |
2006-09-03 | Perforation Treatment Performed - Fractured |
2006-09-27 | Well Began Production |
2006-09-27 | Well Fluid changed to Crude Oil |
2006-09-27 | Well Mode changed to Pumping |
2019-07-26 | Well Fluid changed to Crude Oil |
2019-07-26 | Well Mode changed to Suspended |
For data sources see[3]
Perforation Date | Perforation Type | Interval Top (m) | Interval Base (m) | Number of Shots |
---|---|---|---|---|
1982-11-03 | Perforation | 2381.00 | 2382.50 | 13 |
1982-12-04 | Fracture | 2274.00 | 2280.00 | 0 |
1986-07-11 | Perforation | 2297.00 | 2301.00 | 7 |
1986-07-13 | Cement Squeeze | 2274.00 | 2301.00 | 0 |
1986-07-17 | Perforation | 2318.00 | 2320.00 | 7 |
1986-07-17 | Perforation | 2321.00 | 2321.50 | 7 |
2006-08-16 | Perforation | 2324.00 | 2327.00 | 17 |
2006-08-16 | Perforation | 2321.00 | 2321.50 | 17 |
2006-08-16 | Perforation | 2318.00 | 2320.00 | 17 |
2006-08-20 | Fracture | 2318.00 | 2321.50 | 0 |
2006-08-29 | Perforation | 2297.00 | 2301.00 | 17 |
1982-11-04 | Acid Treatment | 2381.00 | 2382.50 | 0 |
2006-09-03 | Fracture | 2297.00 | 2301.00 | 0 |
1982-11-06 | Packing Device Capped w/Cement | 2363.00 | 2375.00 | 0 |
1982-11-07 | Perforation | 2342.50 | 2347.00 | 7 |
1982-11-07 | Acid Treatment | 2342.50 | 2347.00 | 0 |
1982-11-10 | Cement Squeeze | 2342.50 | 2347.00 | 0 |
1982-11-11 | Perforation | 2297.00 | 2301.00 | 7 |
1982-12-01 | Packing Device Capped w/Cement | 2285.00 | 2293.00 | 0 |
1982-12-02 | Perforation | 2274.00 | 2280.00 | 7 |
For data sources see[4]
Period | Total Production Hours | Gas Quantity (m3) | Oil Quantity (m3) | Water Quantity (m3) |
---|---|---|---|---|
2006 | 1992 | 0.0 | 0.0 | 0.0 |
2007 | 7630 | 0.0 | 0.0 | 0.0 |
2008 | 8166 | 0.0 | 0.0 | 0.0 |
2009 | 8659 | 0.0 | 0.0 | 0.0 |
2010 | 8492 | 0.0 | 0.0 | 0.0 |
2011 | 6935 | 0.0 | 0.0 | 0.0 |
2012 | 7104 | 0.0 | 0.0 | 0.0 |
2013 | 8291 | 0.0 | 0.0 | 0.0 |
2014 | 6248 | 0.0 | 0.0 | 0.0 |
2015 | 8323 | 0.0 | 0.0 | 0.0 |
2016 | 2884 | 0.0 | 0.0 | 0.0 |
2018 | 72 | 0.0 | 0.0 | 0.0 |
2019 | 24 | 0.0 | 0.0 | 0.0 |
For data sources see[5]