X

Track changes made to this page

If you find this page useful and would like to be notified of changes made to this page, start by inputting your email below.



Privacy policy
Close this window

powered by ChangeDetection

0395040412000

Well Details

Well ID: 0395040412000
Loading map...
Location: 00/12-04-039-04W5/0
Location Alias: 00/12-04-39-04 W5M
Location Alias 2: 00/12-04-039-04 W5/00
Country: Canada
Province: Alberta
Township: 039
Meridian: 5
Range: 04
Section: 04
County/Municipality: Clearwater County
Well Name: CALPINE MEDICINE RIVER 12-4-39-4
Operator Name: Calpine Canada Resources Company
License Number: 0045353
License Date: 1973-03-07
License Status: RecCertified
Spud Date: 1973-05-15
Final Drill Date: 1973-05-29
Well Total Depth: 2263.10 m
Surface Hole Latitude: 52.328902
Surface Hole Longitude: -114.526214

For data sources see[1][2]

Well History

Date Event
1909-09-09 Well Log Performed
1973-03-07 Obtained License
1973-05-29 Finished Drilling
1973-05-29 Well Mode changed to Drilled and Cased
1973-05-30 Production Casing Operation Performed
1973-06-01 Well Began Production
1973-06-01 Well Fluid changed to Crude Oil
1973-06-01 Well Mode changed to Pumping
1973-06-08 Perforation Treatment Performed - Jet Perforation
1973-06-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-04-28 Perforation Treatment Performed - Acid Squeeze - Press Used
1982-11-09 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-09-25 Well Log Performed
1990-09-26 Perforation Treatment Performed - Jet Perforation
1990-09-27 Perforation Treatment Performed - Acid Squeeze - Press Used
1990-10-03 Perforation Treatment Performed - Fractured
1994-08-13 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-13 Perforation Treatment Performed - Jet Perforation
1994-08-13 Plug Back Performed
1994-08-14 Perforation Treatment Performed - Bridge Plug Capped W/Cement
1994-08-14 Well Fluid changed to Crude Oil
1994-08-14 Well Mode changed to Abandoned
1994-08-16 Well Abandoned

For data sources see[3]


Perforation Treatments

Perforation Date Perforation Type Interval Top (m) Interval Base (m) Number of Shots
1973-06-08 Perforation 2243.90 2245.20 7
1994-08-13 Perforation 536.00 536.50 13
1994-08-14 Packing Device Capped w/Cement 521.50 537.50 0
1973-06-08 Perforation 2246.40 2247.90 7
1973-06-09 Acid Treatment 2243.90 2247.90 0
1982-04-28 Acid Treatment 2243.90 2247.90 0
1982-11-09 Acid Treatment 2243.90 2247.90 0
1990-09-26 Perforation 2243.30 2247.90 18
1990-09-27 Acid Treatment 2243.30 2247.90 0
1990-10-03 Fracture 2243.30 2247.90 0
1994-08-13 Packing Device Capped w/Cement 2227.00 2235.00 0

For data sources see[4]


Production Data

Period Total Production Hours Gas Quantity (m3) Oil Quantity (m3) Water Quantity (m3)
1973 1454 0.0 0.0 0.0
1974 4045 0.0 0.0 0.0
1975 2095 0.0 0.0 0.0
1976 1794 0.0 0.0 0.0
1977 4593 0.0 0.0 0.0
1978 4849 0.0 0.0 0.0
1979 4959 0.0 0.0 0.0
1980 3110 0.0 0.0 0.0
1981 4984 0.0 0.0 0.0
1982 7520 0.0 0.0 0.0
1983 8306 0.0 0.0 0.0
1984 7694 0.0 0.0 0.0
1985 5518 0.0 0.0 0.0
1986 5808 0.0 0.0 0.0
1987 8564 0.0 0.0 0.0
1988 4100 0.0 0.0 0.0
1990 884 0.0 0.0 0.0
1991 3312 0.0 0.0 0.0

For data sources see[5]

References